Provision of Technical/ Secretariat Support to RDCs and NB-RDCom
 

Technical assistance/ secretariat services provided to RDC/ EXCOM/AdCom/Sectoral Committees, LADCC

Provided technical secretariat services to 6 RDC meetings, 2 LADCC meetings, various sectoral committee meetings and 1 RLUC meeting

 

    Prepared RDC Accomplishment Report 

 

 

Revised RDC 5 Manual of Operations

 

 

 

Approval of the CIPG guide-lines, Revised RDC Manual of Operations

 

Unprogrammed:  Formulation of the Compre-hensive Investment  Program-ming Guidelines (CIPG), and Revision of the RDC Manual of Operations

  Luzon Transport Master Plan (LTMP) prepared Sanitized/firmed up list of priority transport projects for Luzon  
  Camarines Norte Provincial Physical Frame-work Plan endorsed to HLURB for review and approval Prepared requirements for the approval of the Camarines Norte Physical Framework Plan to HLURB The Camarines Norte PPFP was already approved by HLURB. The formulation ensured the mainstreaming of sustainable development projects
Technical Assistance to Local Government Units (LGUs)
  Technical assistance provided to LGUs including regional line agencies

Conducted a refresher course on geographic information system (GIS) for Catan-duanes PPDO

 
    Provided technical assistance to Buhi, Camarines Sur during the presentation of the draft Socio-economic and Physical Profile to the Sangguniang Bayan  
    Provided TA on various INFRES projects  
    TA on Environ-mental Impact Assessment of Sanitary Landfill Facility at BUCAF, Guinobatan, Albay  
    Facilitated/assisted 3 CBMS Trainings conducted by DILG  
   

Assisted the Land Management Services of the DENR 5 in the proposal preparation for the computerization of maps

 
    TA to BFAR & AECI for the preparation of a Fishery Resource Management Project Proposal  
  Revitalized Project Development Assistance Center (PDAC)   Upon request from RLAs/LGUs
  Facilitate the funding and implementation of priority development programs and projects

Prepared inventory of priority projects
Recruited pool of experts from the academe

Directory of members prepared

Unprogrammed:
Creation/organization of the Bicol Project Development Committee (BPDC)

 

Technical assistance provided to LGUs through the Provincial Desk Teams (PDTs)

Provided TA to Camarines Norte in the formulation of their Comprehensive Development Plan and Provincial Development Investment Program  
 

Technical assistance and progress report on SEPPS implementation 

Requested reports from LGUs with SEPPS installed in their PCs on its utilization.   
  Information materials on financing sources distributed to LGUs Multi-national Investment Bancorporation “ Promoting Access to Capital Market” (an invitation to engage in Bond Flotation) Unprogrammed:  Dissemination of information on available financing facilities for local government units
    Project proposals for possible funding from the 5th RP-Spain Joint Commission  
  Assistance to the League of Planners Participated in the National Convention and conducted briefing/ orientation on Kilos Asenso Unprogrammed:  Provision of support to the National Convention of the   League of Planners
   

Consolidated comments on the Resolution re to recognize local planners as an arm in the implementation of development programs for national building

 
    RDC approval of the proposed activity  
  ODA Orientation for LGUs Pre-orientation coordination and arrangements with the provinces done

Scheduled ODA Orientations:

Nov.7- Cam. Norte; Nov 8-Sorsogon; Nov. 9-Albay; and Nov. 17-Camarines Sur. Resource persons are from the NRO and NEDA-PIS
Coordination of RDC Budget Review Activities for FY 2007
 

Preparation of Annual Investment Plan (AIP) CY 2007

Prepared and disseminated RDC memorandum circular 01 s. 2006 for the preparation of the Annual Investment Plan for 2007

 
  RDC review and endorsement of CY 2007 Agency/SUC/GOCC Budget Proposals

Reviewed FY 2007 agency and SUC budget proposals and recommended revisions for endorsement

Agency and SUC budget proposals were endorsed by the RDC to their respective central offices and to DBM
   

Participated in the RDC-ACO Dialogue on the FY 2007 budget

 
    Submitted a report on budgeting-related activities in the region to NEDA central office  

 Advocacy of the Proposed National Land Use Act

  Advocacy activities with RDC 5 - Advisory Committee and LGU Leagues   No copy of the revised NaLUA Bill is yet received
Continuing Advocacy and Monitoring the Implementation of the 2004-2010 MTPDP/MTRDPs
 

Advocacy and monitoring of the 2005-2010 MTPDP/MTRDP conducted

Presented the MTRDP in various fora with the following audiences:  LGUs, RLAs, academe, researchers/students, extension;

 
 

Status of MOA commitments forged with League of LGUs, Business Groups/Chambers of Commerce and Industry and SUCs reported

LGU and RLAs’ contributions to the MTRDP implementation are included in the Regional Development Report

 
Evaluation of Region-Specific and Interregional and Intersectoral Programs and Projects Needing ICC Approval
  Project Evaluation Reports of region-specific and interregional and intersectoral programs and projects

Kapuntukan Hill and its vicinity as “Ecotourism Zone”

 
    Bio-Fuels Bill of 2006 Per DOE request for RDC endorsement
  Presentation to ICC of region-specific project proposals

RBWMP
ARISP III Project

ARCP II Project

 

Administration/Management of the Project Development and Monitoring Fund (PDMF)

  Technical Assistance to Recipient LGUs

Provided technical assistance in the preparation of FS on Guinobatan Solid Waste Management Project

 
  Project Study Monitoring Monitoring and evaluation reports prepared  
  TA to the documentation of good practices Documentation of good practices  

Provision of Technical Assistance to Peace Process-Related and Growth Area-Related Activities, i.e., Legazpi-Iriga-Naga-Daet Growth Corridor (LINDGC) Project

  Updated LINDGC website uploaded Updated the LINDGC website  
  TA to project implementation    
 

Licensing system operational for 5 LGUs

   
Strengthening Regional Project Monitoring and Evaluation System (RPMES)
1. Strengthening of Local Project Monitoring Committees (PMCs) Follow-up the LGUs’ reorganization/ reactivation of their Local PMCs    

a. Technical Assistance to Local PMCs

Provided technical assistance to Local PMCs re RPMES

Provided technical assistance to local PMC of Naga City As requested by LGU-Naga

b.  Follow-up on the activities of the Local PMCs

 

Functional Local PMCs

Followed-up submission of quarterly monitoring reports  

c. Conduct of Search for Outstanding LPMC

 

Outstanding LPMC recognized/awarded

Local Project Monitoring Committee of Legazpi City awarded with Certificate of Recognition. The award granted is for CY 2005

2. Project Monitoring
Activities

     

a. Preparation of List of CY 2006 approved and on-going P/Ps to be provided to Congressmen and local PMCs.

List of CY 2006 approved and ongoing programs and projects List of projects by congressional district was disseminated to the 14 Bicol Congressmen  
b. Formulation of RPMT Field   Monitoring Plan Regional Project Monitoring Team’s Field Monitoring Plan Prepared/finalized the CY 2006 RPMT Field Monitoring Plan and Field Monitoring Guide

Sector inputs incorporated to the list of programs/ projects to be monitored.

 

 - Field Inspection Activities

 

Inspection of projects as identified in the Field Monitoring Plan:
 Foreign Assisted Projects;
 Problematic Projects;
 Presidential Commitments;
 Calamity Funded Projects;
 Project for RME monitoring

 

Monitored/inspected the following projects:
1. President’s Bridge Program and DAR projects in Albay

2. Foreign Assisted Projects in Catanduanes

 

Undertaken by sector staff and other RPMC member agencies
  Field Monitoring and evaluation reports

Prepared field monitoring and evaluation reports

 
c.  Project Facilitation and Problem Solving Session

Problematic projects resolved, project implementation facilitated

Provided assistance in resolving issues on road Right-of-Way (ROW) concerns and peace and order in the implementation of the Catanduanes Circumferential Road Project (CCRP)

DPWH resolved the issue on road right- of-way

Province of Catanduanes requested military intervention to secure peace and order in the project site

d. Generation and Preparation of   Periodic RPMES Reports/Documents

RPMES Quarterly Reports

 

Completed.  
- Results Monitoring and Evaluation

Piloting of one project for Results Monitoring and Evaluation (RME)

 

  No RME training scheduled yet by the NEDA-PMS
 

Report generation/preparation for RME

   

3. Updating and Uploading of RPMES Website

RPMES Website updated Updated RPMES Web for uploading  
4. RPMC and RPMT Provision of Technical and Secretariat Support Services to the conduct of RPMC and RPMT Meetings

Conducted 1 RPMC and 1 RPMT meetings
 - Prepared invitation letters, discussion/presentation papers, agenda folders, agreements, minutes of meetings

 
  Coordination works with NEDA Technical Divisions, RPMC member-agencies and other concerned entities Coordinated with RPMC member agencies and LGU-Catanduanes re conduct of field inspection and RPMC meeting in Catanduanes.  
 

Project-related issues elevated to the NPMC, RDC or referred to concerned implementing agencies

   
Strengthening Knowledge Management
  Various regional socio-economic and development reports:    
 

Quarterly Regional Economic Situationer (QRES) - 4th quarter 2005, 1st to 3rd quarters 2006

QRES for the 4th quarter, 1st to 2nd quarters 2006

 
  Revised guidelines for the preparation of the QRES Guidelines for QRES preparation was revised and disseminated to concerned agencies.    A series of meetings was held with NRO staff and agencies involved Unprogrammed:  Revision of QRES report preparation
  Third quarter QRES

Request for inputs from data sources and conduct of key informant interviews for the third quarter QRES

 NRO workshop on the third quarter QRES

 
 

Updated Sectoral Databases

Updated sectoral databases on macroeconomy and development finance

 
 

CY 2005 Regional Development Report (RDR)

CY 2005 Regional Development Report was prepared with inputs from agencies, SUCs and LGUs

Copies were sent to NEDA- RDCS and RDC Chair and Co-Chair

 
 

Geographic Information System-based physical profile

Acted on the request of Lupi LGU to scan the maps from BSWM for digitization

 
  Updated NEDA and RDC websites

Materials for updating the NEDA and RDC websites were prepared 

 
  Best Practices uploaded in Knowledge Emporium and Dunong Bicol  

Ongoing migration to LINUX

Support to Major Sectoral and Special Programs/Projects
KALAHI
a. Provision of Secretariat support to KALAHI RKCG      
 

Coordination and report on meetings and TA provided

Provided TA to RKCG meetings and participated in Kalahi Para sa Kalayaan (KpK) launchings in Sorsogon and Ligao City  
 

KALAHI program implementation issues/ concerns documented and reported to RDC, NAPC and concerned stakeholders

Prepared Report on Conflict Analysis & Program Planning,  
 

KALAHI accomplishment reports prepared.

Accomplishment Report prepared.  

b. Attendance to Cluster Meetings

Report on meetings 3 Cluster Head Meetings attended Scheduled by respective clusters
 - Field Visits

Status of project implementation reported to RKCG

  Depends upon funding support from NAPC.

Country Program for   Children (CPC) VI

Local Policy and Institutional Development      
 a. TA to CPC VI areas (Masbate/Cam. Norte) and in other provinces/cities

 

  -  Resource Person/ Facilitator during trainings

Local Plans/ Local Investment Plan/ Local Code for Children /

State of the Children Report prepared/ formulated
LDPC reorganized/ strengthened

IEC on CFM


Activity Implementation Report on meetings and other project-related activities prepared

Provided TA to LDPC/LIPC preparation in Ligao, Sorsogon, Cam. Sur & Iriga

4 LDPC orientation/ workshops(Cam Sur Sorsogon, Iriga & Ligao

Submitted CPC 6 Work & Financial plan to UNICEF

2 RSCWC meetings re: Presidential Awards for Child-Friendly Municipality/ City


Evaluated ECCD WFP of the province of Catanduanes

 
 b. Operationalization of Knowledge Center (KC)      
Updating of DevInfo indicators

 

Training on DevInfo  and TA on the establishment of LGUs/ RLAs DEVINFO database

 

Knowledge Network Committee Meetings

Regional State of children report

MDG Progress Report prepared

Establishment of DevInfo Database by partner agencies/ LGUs/NEDA

Issues addressed

Update of indicators needed for MDG Progress Report preparation; 42 indicators updated

Conducted 2MDG inter-agency task force meetings re: updating of MDG indicators and the preparation of MDG progress reports

DevInfo training conducted for RLAs & LGUs (provinces and cities only)

Problems on DevInfo installation resolved/status of database establishment  was reported by RLAs/ LGUs; TA provided to DOH re Devinfo installation
 
 c. Field Visits/ Monitoring      

CPC 6 program implementation in focus areas

LCPC functionality/four gifts

Review/ assessment of LPID implementation

Program implementation monitored and monitoring reports prepared

Functional LCPC

Midyear/yearend assessment conducted

Attended RSCWC Mid-year Assessment/Conference

Monitoring activity reset by DILG to 2nd sem due to delay in release of UNICEF funding

KR-2 Implementation

 a. Monitoring of KR-2 Projects

Problems, issues, concerns resolved

Prepared evaluation and monitoring reports  

 b. Evaluation & endorsement of liquidation for the final release of KR-2 Grant

Endorsement reports submitted

Endorsed project of Monreal, Masbate; Bulusan, Sorsogon; and 2 projects of Pandan, Catanduanes to MDFO for the release of remaining 20 percent fund.          

 

 c. Preparation of updates on the status of KR-2 project implementation

KR-2 status report updated

Prepared updates on the implementation of KR-2 projects      

 

Coordination and Technical Support to Mainstreaming Sustainable Development (MSD) Project/PA 21 Implementation

 

TA provided for the integration of PA 21 in local planning

Monitoring reports prepared for MSD projects/activities

Developed and institutionalized mechanism for the integration of SD and PA 21 into MTRDP, budgetary formulation, adoption and review process

Monitored MSD Projects/Activities in Camarines Norte=

 
 

Technical assistance provided to SUCs in Bicol

Project Evaluation Reports for the NEDA-Productivity Enhancement Project (PEP)

Submitted to CO the 4th Quarter Work and Financial Plan

Conducted project briefing with SUCs

Conducted a review and evaluation of projects proposals and provided feedback to proponents

Conducted consultation meetings with SUCs for the refinement of the proposals

Unprogrammed:  Coordination and technical support to the NEDA-Productivity Enhancement Project

Adoption of Productivity Enhancement Program
  Improved technical and  administrative  processes:

Well-maintained and upgraded Local Area Network (LAN)

Development of an RDC Resolution Tracking and Archive System (RTAS)

Reorganized NRO 5 Information Technology Committee

Updated inventory of IT hardware and software

On line updating of remittances and personal loan ledgers

 

Support to the NEDA Rationalization   Activities

 

Implementation of NRO rationalized structures, functions and processes

Provided inputs to the rationalization activities  
Plan Formulation and Implementation Coordination
  Participation and coordination of activities

Coordinated with provincial planning and development coordinators on their participation to the training on Provincial Planning and Local Expenditure Management

Participated in the Disaster Risk Management Forum

 
  Provided comments/inputs to draft policy and position papers

Comments/ inputs were submitted to NEDA-CO on:

Strengthening the National Land Use Committee; Provincial Planning in Relation to Physical Planning; AO 148—on the membership of DOH,DILG, DFA, DAR in the RDC;  Disaster Management Bill

 

Investment Programming

  Bicol Component of the CPIP prepared Prepared and presented to the RDC the Bicol Component of the Central Philippines Public Investment Program (CP-PIP) Unprogrammed:  Participated in the formulation of the Central Philippines Investment Program

Bicol governors, private sector representatives and regional  directors of line agencies participated in joint RDC-Cabinet meetings on the CPIP

 