STATUS OF PRESIDENT'S BRIDGE PROGRAM
JBIC ASSISTED BRIDGE REPLACEMENT PROJECT
As of December 2005

Name of Bridge/
Station
Road Section/
Location
Proposed Type/
Length  (LM)
Project
Cost (PM)
Date
a. Start
b. Target
c. Revised
Percent
Accomplish-
ment
Remarks
Hulugan
Km. 574+340
Legazpi-Punta de Jesus Road
Manito, Albay
        On-going.
Detailed engineering
Salog
Km. 500+320
Goa-Digdigon-San Isidro Road
Goa, Camarines Sur
        On-going.
Detailed engineering
Patrocino
Km. 514+030
Lagonoy-Presentacion Road
Lagonoy/
Presentacion, Camarines Sur
        On-going.
Detailed engineering
Pasusuhan
Km. 513+268
Tinambac-Siruma Road
Tinambac, Camarines Sur
        On-going.
Detailed engineering
Pugay
Km. 488+041
San Raael-Salong-San Jose Road
San Jose, Camarines Sur
        On-going.
Detailed engineering
Ragas III
Km. 488+062
Tigaon-Goa-Lagonoy Road
Catagbakan, Goa, Camarines Sur
        On-going.
Detailed engineering
Batolinao
Km. 019+428
Bato-Baras Road
Baras, Catanduanes
        On-going.
Detailed engineering
Libjo
Km. 011+456
Bato-Baras Road
Bato, Catanduanes
        On-going.
Detailed engineering
Gogon
Km. 203+400
Virac-Viga-Pandan-San Andres Road
Virac, Catanduanes
        On-going.
Detailed engineering
Banuang Gurang
Km. 589+406
Donsol-Banuang Gurang Road
Donsol, Sorsogon
        On-going.
Detailed engineering
Basiao
Km. 586+358
Donsol-Banuang Gurang Road
Donsol, Sorsogon
        On-going.
Detailed engineering