Infrastructure
This chapter presents the level of performance of the infrastructure sub-sector components such as transportation, communication and water resources. Vital to the recovery and
development of the region, intensified effort was given in restoring various infrastructure facilities that were damaged by super typhoons Milenyo and Reming which ravaged the region in the later part of CY 2006. The massive infrastructure works
during the period considerably scaled up government spending in key public facilities which contributed to job creation and
revitalization of ancillary services.
Under the Bicol Calamity Assistance Rehabilitation Effort (B-CARE), out of the total 217 projects assigned to the Department of Public Works and Highways (DPWH) Regional Office
5, 166 were completed, 49 on-going while 2 are on pre-construction phase. This included the repair/rehabilitation of roads, flood control and seawall structures. Overall
accomplishment as of December 31, 2007 was 84.20 percent (Table 6.1). With PhP1.325 billion funds released last April 2007 for
DPWH CARE projects, formal bidding of the said projects started last May 28, 2007.
Table 6.1 Accomplishments of DPWH CARE-Funded Projects,
National Roads, Flood Control and Seawalls
(As of December 31, 2007)
|
Province/District |
Allocation |
Total
No. of
Projects |
Com-pleted |
On-Going |
NYS |
Accomplish-
ment (%) |
|
Albay |
|
|
|
|
|
|
|
1st Legislative Dist. |
170,000,000 |
38 |
32 |
6 |
0 |
85.00 |
|
2nd
Legislative Dist. |
321,800,000 |
28 |
18 |
10 |
0 |
87.73 |
|
3rd Legislative Dist. |
408,200,000 |
75 |
54 |
19 |
2 |
75.32 |
|
Camarines Norte |
|
|
|
|
|
|
|
Lone District |
0,000,000 |
4 |
3 |
1 |
0 |
91.67 |
|
Camarines Sur |
|
|
|
|
|
|
|
1st Legislative Dist. |
48,000,000 |
4 |
4 |
0 |
0 |
100 |
|
2nd Legislative Dist. |
50,000,000 |
3 |
0 |
3 |
0 |
86.85 |
|
3rd Legislative Dist. |
30,000,000 |
11 |
10 |
1 |
0 |
97.92 |
|
4th Legislative Dist. |
52,000,000 |
8 |
8 |
0 |
0 |
100.00 |
|
Catanduanes |
|
|
|
|
|
|
|
Lone District |
70,000,000 |
17 |
12 |
5 |
0 |
80.38 |
|
Masbate |
|
|
|
|
|
|
|
1st Legislative Dist. |
26,000,000 |
7 |
5 |
2 |
0 |
90.77 |
|
2nd Legislative Dist. |
31,000,000 |
2 |
0 |
2 |
0 |
42.58 |
|
3rd Legislative Dist. |
28,000,000 |
3 |
3 |
0 |
0 |
100.00 |
|
Sorsogon |
|
|
|
|
|
|
|
1st Legislative Dist. |
30,000,000 |
6 |
6 |
0 |
0 |
100.00 |
|
2nd Legislative Dist. |
30,000,000 |
11 |
11 |
0 |
0 |
100.00 |
|
TOTAL |
1,325,000,000 |
217 |
166 |
49 |
2 |
84.20 |
Source: DPWH 5
Transportation
A. Land
The overall accomplishment of the CY 2007 DPWH Infrastructure Program is
71.02 percent as of December 31, 2007 (Table 6.2). Project implementation is on schedule registering a positive slippage of 0.47 percent. The construction of the remaining
on-going and not-yet-started projects would be carried over in 2008. Overall project implementation was affected by the late release of funding requirements and inclement weather
conditions in the region.
Table 6.2
Accomplishment of DPWH Infrastructure Program, CY 2007
(As of December 31, 2007)
|
Fund Source |
Allocation
(in million pesos) |
Number of Projects |
Accomplishment (%) |
|
Total |
Com-
pleted |
On-
going |
NYS |
Planned |
Actual |
|
Regular Infrastructure Program |
6,003.962 |
924 |
695 |
114 |
115 |
71.76 |
72.26 |
|
PDAF, etc. |
441.535 |
375 |
322 |
4 |
49 |
54.18 |
54.18 |
|
Total |
6,445.497 |
1299 |
1017 |
118 |
164 |
70.56 |
71.02 |
For CY 2006 and 2007 carry-over projects, the overall accomplishment as
of year-end is 97.75 percent. Implementation of the carry-over projects was also on-schedule registering an allowable negative slippage of only 1.67 percent. A total of
1,948 projects were completed, 15 are still on-going and the remaining 7 projects are not yet started (Table 6.3). The remaining on-going and not yet started projects were
programmed in the previous years but with funds released only during the current year, hence, causing the delay in project implementation.
Table 6.3 Accomplishment of DPWH Carry-Over CY 2006 and CY 2005
Infrastructure Program
(As of December 31, 2007)
|
Fund Source |
Allocation
(in million pesos) |
Number of Projects |
Accomplishment (%) |
|
Total |
Com-
pleted |
On-
going |
NYS |
Planned |
Actual |
|
Regular Infrastructure Program |
6,744.651 |
857 |
844 |
10 |
3 |
99.38 |
97.99 |
|
PDAF, etc. |
1,090.123 |
1,113. |
1,104 |
5 |
4 |
99.62 |
96.25 |
|
Total |
7,834.774 |
1,970 |
1,948 |
15 |
7 |
99.41 |
97.75 |
Source:
DPWH 5
The regular maintenance of national roads and bridges under
the DPWH Maintenance Fund had a total allocation of PhP190.797 million intended for the repair and maintenance of 2,196 kilometers national roads, 17,881
linear meters of bridges and roadside maintenance works. PhP141.129 million was allocated for regular carriageway
maintenance and PhP49.668 million for regular roadside maintenance which were all funded under the Special Road Support Fund of the Motor Vehicle Users Charge (MVUC).
The road maintenance projects had an overall physical accomplishment of 83.19 percent as of December 31, 2007 (Table 6.4).
The regular roadside maintenance fund accommodated one worker for every 3.5 kilometers of national road or a
total of 622 workers throughout the region. It was a nationwide roadside maintenance program of DPWH aimed at providing employment to the people in the barangays in
line with the Ten-Point Agenda of the President for job generation. The Hunger Mitigation Program allocated additional funds for roadside maintenance in the
depressed barangays amounting to PhP30.780 million, thereby generating additional employment of 658 roadside workers every month on rotation basis.
Table 6.4 Accomplishment of DPWH Regular Maintenance of National Roads and
Bridges, CY 2007 (As of December 31, 2007)
|
District |
Repair and Maintenance
Fund Allocation |
Additional
Roadside
Allocation
|
Accomplishment
(%) |
|
Carriageway |
Roadside |
Total |
|
Albay I |
10,406,000 |
3,877,987 |
14,283,987 |
0 |
100.00 |
|
Albay II |
13,798,000 |
3,597,690 |
17,395,690 |
0 |
90.40 |
|
Cam. Norte |
14,807,000 |
3942,948 |
18,749,948 |
9,211,004 |
83.01 |
|
Cam. Sur I |
8,416,000 |
2,902,954 |
11,318,954 |
1,011,921 |
78.71 |
|
Cam. Sur II |
6,137,000 |
1,906,150 |
8,043,150 |
682,512 |
61.85 |
|
Cam. Sur III |
20,291,000 |
5,060,598 |
25,351,598 |
1,841,173 |
99.33 |
|
Cam. Sur IV |
6,314,000 |
1,935,175 |
8,249,175 |
675,136 |
98.51 |
|
Catanduanes |
21,855,000 |
6,160,225 |
28,015,225 |
0 |
98.24 |
|
Masbate I |
10,451,000 |
3,525,240 |
13,976,240 |
8,140,693 |
89.20 |
|
Masbate II |
5,936,000 |
1,593,371 |
7,531,371 |
4,564,844 |
67.20 |
|
Masbate Sub |
5,936,000 |
2,286,488 |
7,953,488 |
4,653,274 |
61.02 |
|
Sorsogon I |
8,424,000 |
3,048,315 |
11,472,315 |
0 |
70.55 |
|
Sorsogon Sub |
8,627,000 |
2,832,930 |
11,459,930 |
0 |
73.93 |
|
Total |
141,129,000 |
49,667,844 |
190,796,844 |
30,780,557 |
83.19 |
Source: DPWH
5
The Land Transportation Franchising and Regulatory Board (LTFRB)
issued a total of 8,931 franchises as of December 31, 2007, corresponding to 11,066 units of various public transport
vehicles covering 1,634 different routes (Table 6.5).
Table 6.5 Number of Franchise/Units Issued by LTFRB 5
(As of December 31, 2007)
|
Denomination |
Franchise |
Units |
|
Number |
%Share |
Number |
%Share |
|
PUB |
583 |
6.53 |
928 |
8.39 |
|
PUJ |
6,122 |
68.55 |
7,569 |
68.40 |
|
Vehicles For Hire |
72 |
0.81 |
57 |
0.52 |
|
Shuttle Transport |
3 |
0.03 |
3 |
0.03 |
|
School Transport |
22 |
0.25 |
22 |
0.20 |
|
Trucks for Hire |
263 |
2.94 |
763 |
6.89 |
|
FC Express |
1,866 |
20.89 |
1,724 |
15.58 |
|
Total |
8,931 |
100.00 |
11,066 |
100.00 |
Source: LTFRB 5
Despite the occurrence of strong typhoons that ravaged the region
during the later part of CY 2006, LTFRB Region 5 was able to exceed last year’s revenue by 20.30 percent. For the current
year, the total revenue generated was PhP18.551 million as compared to PhP15.421 million in CY 2006 (Table 6.6).
Table 6.6 Comparative Actual Revenue Generated by LTFRB 5, CY 2006-2007
|
Income Type |
Income as of December |
Increase
(Decrease) |
%
Increase
(Decrease) |
|
2006 |
2007 |
|
Filing Fees |
4,039,930.00 |
6,975,720.00 |
2,935,790.00 |
72.67 |
|
Supervision Fees |
3,636,187.29 |
3,743,629.16 |
107,441.87 |
2.95 |
|
Fines and Penalties |
6,491,123.46 |
6,622,268.87 |
131,145.41 |
2.02 |
|
Miscellaneous Fees |
1,253,636.00 |
1,209,089.98 |
(44,562.02) |
(3.55) |
|
Total |
15,420,876.75 |
18,550,708.01 |
3,129,831.26 |
20.30 |
Source: LTFRB 5
The LTFRB Region 5 had been an efficient income-generating regulatory
agency. Eventhough half of the PhP100,000 per bus filing fee for Petitions for Amnesty for PUB operations went to the
LTFRB Central Office, the agency registered positive net revenue at the end of every calendar year. For CY 2007, with
a budget release of PhP7.542 million, the agency generated an actual income of PhP18.551 million, thus registering positive net revenue of PhP11.009 million. The same in CY
2006, the agency had a budget release of only PhP6.174 million vis-ŕ-vis the actual income of PhP15.421 million (Table 6.7).
Table 6.7 Actual Revenue Generated versus Budget Releases by LTFRB 5,
CY 2005-2007
|
Year |
Actual
Revenue |
Budget
Release |
Net
Revenue |
%
Over |
|
2005 |
22,994,379.77 |
6,134,000.00 |
16,860,379.77 |
274.87% |
|
2006 |
15,420,876.75 |
6,174,000.00 |
9,246,876.75 |
149.77% |
|
2007 |
18,550,708.01 |
7,542,000.00 |
11,008,708.01 |
145.98% |
Source: LTFRB 5
During the current year, the agency had restored the services
of two Mobile Franchising Units (Daet and Masbate City)to bring government services closer to the clienteles despite limited LTFRB budget. The LTFRB Daet Extension Office was able to handle 2,266 various transactions
while Masbate Extension Office handled a total of 180 transactions during CY 2007.
B. Water
The Philippine Ports Authority (PPA) Port Management Office of Legazpi(PMO-Legazpi) supervised 8 terminal ports (PPA national
ports), 14 municipal ports and 13 private ports in the entire region.
In CY 2007, the gross revenue performance of the entire
PMO-Legazpi increased by about 15 percent compared in 2006. The actual generated revenue for CY 2007 was PhP70.445 million indicating a slight increase over the
CY 2006 revenue of PhP61.879 million (Table 6.8).
Not to mention the sluggish performance of the present economy
such other constraints like the existence of cement cartel, the series of typhoons that hit the region in the last quarter of the year, the decreased exportation
of coconut oil abroad and the suspension of the importation of cement clinker for the local cement factory have affected the performance of the PMO.
Table 6.8 Gross Revenues Generated By Terminal, PMO – Legazpi,
CY 2006-2007
|
Terminal Ports
(including Mun. and
Private Ports) |
Revenues |
%
Growth |
|
2006 |
2007 |
|
Baseport Legazpi* |
12,389,428 |
10,624,096 |
(14) |
|
Bulan |
1,246,838 |
1,864,836 |
50 |
|
Jose Panganiban |
1,316,687 |
458,012 |
(65) |
|
Masbate |
6,455,332 |
7,770,848 |
20 |
|
Matnog |
18,431,757 |
17,973,958 |
(2) |
|
Pasacao |
2,463,049 |
2,988,603 |
21 |
|
Tabaco |
15,290,621 |
24,635,569 |
61 |
|
Virac** |
3,533,800 |
4,129,696 |
17 |
|
Total |
61,127,512 |
70,445,618 |
15 |
*
Includes Pantao Port statistics
** Includes San Andres Port Statistics
Source: PPA-PMO Legazpi
A 13 percent increase in vessel traffic was noted in CY
2007 with 20,597 shipcalls as compared to 18,153 shipcalls recorded in CY 2006. The increment was mainly attributed to domestic shipping traffic provided by RORO
ferries and fastcrafts plying the various passenger ports of the region (Table 6.9). The foreign shipcalls registered a decrease in CY 2007 due to reduced crude
coconut oil exportation caused by low supply of coconut products as a result of the series of strong typhoons that hit the country in CY 2006.
Contrary to the increase in shipcalls, shipping tonnage slid by 2
percent since the shipping traffic was mostly composed of domestic passenger vessels with small gross registered tonnage (GRT) like fastcrafts and RORO
vessels. Few international ships, cargo vessels and big fishing vessels docked the region’s national ports due to low economic activities.
The vessels’ gross registered tonnage (GRT) recorded in CY 2007 decreased by 2 percent (6.070 million tons) as
compared to 6.204 million tons in CY 2006 (Table 6.9)
Table 6.9 Shipcalls and Shipping Tonnage Statistics by Terminal,PMO-Legazpi,
CY 2006-2007
|
Terminal Ports
(incl.
Mun.
&
Private Ports) |
Shipcalls (Number) |
Shipping Tonnage (GRT) |
|
2006 |
2007 |
%
Growth |
2006 |
2007 |
%Growth |
|
Baseport Legazpi* |
1,999 |
2,572 |
29 |
734,940 |
501,164 |
(32) |
|
Bulan |
4,866 |
4,673 |
(4) |
89,817 |
119,181 |
33 |
|
Jose Panganiban |
15 |
19 |
27 |
39,414 |
22,637 |
(43) |
|
Masbate |
3,839 |
4,799 |
25 |
1,350,213 |
1,248,183 |
(8) |
|
Matnog |
3,964 |
5,286 |
33 |
2,658,878 |
2,810,093 |
6 |
|
Pasacao |
394 |
436 |
11 |
296,510 |
335,418 |
13 |
|
Tabaco |
1,542 |
1,444 |
(6) |
553,598 |
616,301 |
11 |
|
Virac** |
1,534 |
1,368 |
(11) |
480,494 |
417,276 |
(13) |
|
Total |
18,153 |
20,597 |
13 |
6,203,864 |
6,070,253 |
(2) |
*
Includes Pantao Port statistics
** Includes
San Andres Port Statistics
Source: PPA-PMO Legazpi
In terms of cargo, the region’s ports handled a total of 4.027
million metric tons of cargo in CY 2007 registering a modest 10 percent increase over the CY 2006’s cargo volume of 3.666 million metric tons (Table 6.10).
The increase in domestic cargo could be attributed to both
government and private ports. However, large volumes of inbound and outbound cargoes were noted in the following
private ports: (1) Batan Port – gravel, sand, and coal; (2) NFH Port – fish products; (3) Globe Coco Port – copra and crude coconut oil; and (4) Shell Pasacao Port
– refined petroleum products.
Foreign cargoes showed positive growth due to large volume of
imported rice and pyrite discharged at Tabaco Port, methanol surfactant at Panganiban Port and imported coal unloaded at Baseport Legazpi.
Some 2.845 million passengers used the services of various
ports in CY 2007. This figure posted a 1 percent decrease from last year’s 2.879 million commuters (Table 6.10). The slight overall decrease could be attributed
to the frequent cancellations of voyages during typhoons/rainy season and non-operation of one passenger servicing port in Pasacao, Camarines Sur.
The biggest volume of passengers was concentrated at Matnog Port
which serviced about 1.481 million passengers or more than half (52%) of the total passenger traffic during the current year. Matnog Port is servicing the Maharlika
Highway as a RORO port for the inter-regional travel to the Visayas and Mindanao. The port also serves as a vital support to the Strong Republic Nautical Highway.
Table 6.10 Cargo Traffic and Passenger Traffic by Terminal, PMO-Legazpi,
CY
2006- 2007
|
Terminal Ports
(incl.
Mun.
&
Private Ports) |
Shipcalls (Number) |
Shipping Tonnage (GRT) |
|
2006 |
2007 |
%
Growth |
2006 |
2007 |
%Growth |
|
Baseport Legazpi* |
1,999 |
2,572 |
29 |
734,940 |
501,164 |
(32) |
|
Bulan |
4,866 |
4,673 |
(4) |
89,817 |
119,181 |
33 |
|
Jose Panganiban |
15 |
19 |
27 |
39,414 |
22,637 |
(43) |
|
Masbate |
3,839 |
4,799 |
25 |
1,350,213 |
1,248,183 |
(8) |
|
Matnog |
3,964 |
5,286 |
33 |
2,658,878 |
2,810,093 |
6 |
|
Pasacao |
394 |
436 |
11 |
296,510 |
335,418 |
13 |
|
Tabaco |
1,542 |
1,444 |
(6) |
553,598 |
616,301 |
11 |
|
Virac** |
1,534 |
1,368 |
(11) |
480,494 |
417,276 |
(13) |
|
Total |
18,153 |
20,597 |
13 |
6,203,864 |
6,070,253 |
(2) |
* Includes Pantao Port statistics
**
Includes San Andres Port Statistics
Source: PPA-PMO Legazpi
Communications
The available facilities for communication in Bicol are postal and telecommunications. Postal communication service
is provided by the Philippine Postal Corporation while telecommunication services are provided by various providers regulated by the National Telecommunications Commission (NTC).
The impact of information and communications technology is the best proof that the gains of technology can trickle down
to all sectors of society. People from all economic classes, age groups and demographics have been influenced by the
innovations that continue to sweep the industry.
A. Telecommunication
The performance of the Regional NTC is dependent on the
National NTC which provides the general directions of the operation of the Commission. The NTC is a regulatory agency providing an environment that ensures reliable,
affordable and viable infrastructure and services in information and communication technology (ICT) accessible to all.
For CY 2006, the Regional NTC issued 1,134 licenses, permits
and certificates. It has inspected and investigated 317 radio installations and stations, a sharp decline from previous records due to the effects brought by typhoons
Milenyo and Reming. It has also monitored 4,575 frequency channels and disposed 59 administrative cases. It has collected a total revenue of PhP3,505,160.00.
In terms of telephone density, the region posted 2.12
installed lines per 1,000 population and 1.32 subscribed lines per 1,000 population in CY 2006. This is lower compared to the national figures of 7.76 installed lines
per 1,000 population and 4.00 subscribed lines per 1,000 population. Based on the regional distribution of telephone lines (Table 6.11), the region ranked 11th
among the 16 regions.
Table 6.11 Regional Distribution of Telephone Lines, CY 2006
|
Region |
Population |
Installed
Lines |
Subscribed
Lines |
Teledensity |
|
Installed |
Subscribed |
|
CAR |
1,553,173 |
89,154 |
33,660 |
5.74 |
2.17 |
|
NCR |
11,289,368 |
2,840,239 |
1,619,608 |
25.16 |
14.35 |
|
I |
4,481,820 |
192,581 |
111,696 |
4.30 |
2.49 |
|
II |
3,086,812 |
37,990 |
28,066 |
1.23 |
0.91 |
|
III |
8,426,578 |
408,207 |
271,175 |
4.84 |
3.22 |
|
IV |
12,810,064 |
1,073,343 |
581,450 |
8.38 |
4.54 |
|
V |
5,165,243 |
109,631 |
68,387 |
2.12 |
1.32 |
|
VI |
6,884,429 |
427,481 |
135,385 |
6.21 |
1.97 |
|
VII |
6,068,238 |
470,616 |
222,748 |
7.76 |
3.67 |
|
VIII |
4,133,242 |
151,652 |
27,790 |
3.67 |
0.67 |
|
IX |
3,522,722 |
35,945 |
29,446 |
1.02 |
0.84 |
|
X |
3,189,990 |
146,258 |
56,361 |
4.58 |
1.77 |
|
XI |
5,902,604 |
322,243 |
108,916 |
5.46 |
1.85 |
|
XII |
2,971,763 |
82,616 |
31,864 |
2.78 |
1.07 |
|
XIII |
2,319,415 |
117,116 |
31,927 |
5.05 |
1.38 |
|
ARMM |
2,409,317 |
33,315 |
8,773 |
1.38 |
0.36 |
|
Total |
84,214,778 |
6,538,387 |
3,367,252 |
7.76 |
4.00 |
Source: NTC
There were 113 stations that operated in 2006. This indicated
that the telegraphic means had lesser patronage in terms of information communication compared to digital means. The facilities were served by private and public
facility operated by TELOF.
The broadcast and CATV industries improved from 2647 to
2,788 facilities nationwide. The region component showed an increase of 15 facilities from 247 to 262 TV relay
stations and CATV. This has increased people’s awareness and accessibility to public information.
B. Postal Communication
CY 2007 again proved to be a challenging period for postal
communication considering the financial crisis encountered by the region due to series of typhoons that strongly hit all parts of Bicol Region in the last
quarter of CY 2006. Despite this situation, the Philippine Postal Corporation (PPC) Region 5 realized a revenue of about PhP53 million, 89.12 percent attainment
compared to the CY 2007 revenue target of PhP59,832,532. This is 1.91 percent lower than the revenue for CY 2006 of PhP54 million. This can be attributed to the
continuous decrease of postings from institutional customers like GSIS, SSS and Philhealth and other major customers with business counterparts in other countries
who temporarily suspended their business transactions.
Phil-post 5 operation also increased on other postal products and services especially those not affected by
the advancement in communication technology. These products and services include mail permits, business mails, presentation to customs, rent income,
registration fees, and the postal ID.
Irrigation, Drainage and Flood Control
A. Irrigation
The only crop grown in irrigated lands is paddy rice through
surface type of irrigation. It has provided support to the region’s food security.
Out of the region’s potential irrigable area of 239,660 hectares, about 50 percent has been developed. Of the
developed service area, 20,487 hectares were National Irrigation Systems (NIS), 68,227 hectares Communal Irrigation Systems and 31,207 hectares were Private
Irrigation Systems. It remained low because the focus of the irrigation sector was on the restoration and rehabilitation of irrigation systems particularly those
damaged by typhoons Milenyo and Reming and on the institutional strengthening of the farmer beneficiaries.
There were 463 hectares of new areas developed, 7,065 hectares rehabilitated and 3,711 hectares restored. The
implementation of rehabilitation, restoration and new projects was greatly hampered by heavy rainfall.
Seventy-seven NIS irrigators associations (IAs) were recipients of institutional strengthening activities of
the NIA with 67 strengthened, 2 organized and 8 registered with the Securities and Exchange Commission (SEC). There were 13 IAs that renewed their operation
and management contract for NIS and 87 IAs executed their memorandum of agreement with NIA for Communal Irrigation Systems.
The average cropping intensities of the National Irrigation
Systems went down from 138.24 percent to 135.59 percent and Communal Irrigation Systems from 123 percent to 119 percent, respectively. This was attributed to the heavy
rains experienced during the year.
B.
Flood Control
Frequent weather disturbances affected the Bicol Region inducing water related hazards such as floods,
landslides, mud and debris flow. To cope with these hazards, flood control and management was of vital importance to the region for its social and economic
development. Flood management however only focused on the more expensive engineering solutions rather than the non-structural measures. The structural measures were
necessary but not sufficient.
Intermittent sections of river training works and drainage structures were constructed solving the problem
locally. Palliative measures such as dredging of rivers were also common but these were not effective and efficient
because dredged materials were just dumped along riverbanks. Engineering solutions continued to be implemented in the region.
For CY 2007, DPWH 5 flood control projects were not
implemented as of December 2007 because funds were not yet released. Actual implementation of these projects may take place in March 2008 should the budget
allocations are released. For regular fund projects, it had an allocation of PhP78.675 million composed of 81 flood control projects. Meanwhile, for special projects
it was composed of 13 flood control projects with a total allocation of PhP13.474 million. Regular projects are implemented by DPWH District Engineering Offices
while special projects which include Mayon Sabo Works, Upper Bicol River Basin flood control projects in Albay, and lower Bicol River Basin flood control projects in
Camarines Sur are implemented by DPWH Regional Office.
back to top |