back to top

    | Home | About Us | NEDA 5 | RPMES On-Line  | NEDA 5 E-Library | Links |
FOREWORD
ACKNOWLEDGEMENT
EXECUTIVE SUMMARY
MACRO ECONOMIC ASSESSMENT

PART I:  RESPONDING TO THE BASIC NEEDS

CHAPTER 1: HEALTH
CHAPTER 2:  NUTRITION
CHAPTER 3: FAMILY PLANNING
CHAPTER 4:  BASIC AND TERTIARY EDUCATION
CHAPTER 5: SKILLS DEVELOPMENT
CHAPTER 6: HOUSING AND COMMUNITY DEVELOPMENT
CHAPTER 7:  SOCIAL WELFARE
CHAPTER 8:  LABOR WELFARE AND PROTECTION

PART II:  PROMOTING ECONOMIC GROWTH

CHAPTER 9:  AGRICULTURE
CHAPTER 10:  FISHERIES
CHAPTER 11:  FORESTRY
CHAPTER 12:  MINING AND QUARRYING
CHAPTER 13:  TRADE AND INDUSTRY
CHAPTER 14:  TOURISM

PART III: INFRASTRUCTURE SUPPORT FACILITIES

CHAPTER 15: LAND TRANSPORTATION
CHAPTER 16: WATER TRANSPORTATION
CHAPTER 17: AIR TRANSPORTATION
CHAPTER 18: COMMUNICATIONS
CHAPTER 19: IRRIGATION, DRAINAGE AND FLOOD CONTROL
CHAPTER 20: POWER GENERATION, TRANSMISSION AND DISTRIBUTION
PART IV: DEVELOPMENT ADMINISTRATION
CHAPTER 21: INVESTMENT PROMOTION
CHAPTER 22:  PRODUCTIVITY IMPROVEMENT
CHAPTER 23:  SCIENCE AND TECHNOLOGY
CHAPTER 24:  GOOD GOVERNANCE
CHAPTER 25:  PEACE AND ORDER
CHAPTER 26:  DISASTER MANAGEMENT
CHAPTER 27:  SUSTAINABLE DEVELOPMENT
CHAPTER 28:  GENDER AND DEVELOPMENT
CHAPTER 29:  PLAN IMPLEMENTATION
CHAPTER 30:  FINANCING THE PLAN
ANNEX A: STATUS OF TOP TEN PRIORITY PROGRAMS AND PROJECTS OF BICOL REGION


ANNEX A: STATUS OF TOP TEN PRIORITY PROGRAMS AND PROJECTS OF BICOL REGION

Title/Location/ Project Cost Description Status (as of EO December 2008)

1. RORO Ports Along the Central/  Eastern Nautical Highways

Provision of RORO ramp facilities for  existing and proposed ports

 

 a. Pasacao Port, Camarines Sur
     P6.902 million

Repair of typhoon-damaged back-up area

On-going; 27% completed

 b. Pasacao Port, Camarines Sur   
     P0.575 million

Maintenance of physical port facilities

Completed

 c. San Pascual, Masbate
     P28.840 million

Port development

80% completed as of 10/25/08

 d. Claveria Port, Masbate
     P65.150 million

Port development

80% completed as of 10/25/08

 e. Boca Engano, Burias,Masbate
     P80.00 million

 

Proposed

 f. Pantao Port, Libon, Albay

Construction of single phase primary line extension

100% completed

 g. Pioduran Port, Albay

   

 h. Aroroy Port, Masbate
     P97 million

Port development

100% completed

 i. Pilar Port, Sorsogon
    P120 million

  Proposed

 j. Esperanza Port, Masbate
    P80 million

Port development

97.884% as of 11/25/2008; damaged by typhoon

 k. Cawayan Port, Masbate

Construction of RORO facilities

99.88% as of 06/25/08; damaged by typhoon

 l . San Andres Port, Catanduanes

  Proposed

 m . Sangay Port, Camarines Sur

  Proposed

 n .San Vicente, Camarines Sur

  Proposed

2. Bicol River Basin and Watershed Management Project

Location: Camarines Sur, Albay and Camarines Norte

 

The project will pilot a comprehensive development program on natural resources management and water resources projects within the context of a river basin planning management. It has 4 major components:

 
 

 a. Institutional Development

Revised proposal on this component was presented to the ICC-Technical Board meeting on April 24, 2008
P930.851 million

 b. Watershed Management and Development

The revised document was presented to the joint ICC-Cabinet Committee and TB meeting on Nov. 5, 2008.

Based on the comments of the ICC, DENR submitted a revised proposal to NEDA Region 5 for evaluation.  The evaluation report was forwarded by NEDA-PIS to DENR-FASPO for consideration of the issues and recommendations

P2.124 billion

 c. Flood and Hazard Mitigation

Presented to the ICC-TB meeting on April 24, 2008;approved by the ICC-CC on May 15, 2008; confirmed by the NEDA Board on June 3, 2008.

P231.677 million

d. Irrigation Modernization

Approved by the ICC-CC on December 13, 2007 as part of the National Irrigation Administration's (NIA) Participatory Irrigation Dev't Prroject package for financing under the APL of the WB.

3. Bicol Int'l Airport,
Location: Daraga, Albay

P3.440 billion

 

Construction of a new Legazpi Airport of international standards On-going parcellary survey

4. Bicol Mainline South Railway Project

Location: Laguna, Quezon, Camarines Sur, Albay, Sorsogon
Catanduanes
P1.556 billion

The entire project is proposed to be implemented in three phases: (a) Phase 1- Rehabilitation of existing railway line from Calamba to Lucena City (77 kms.);

 

The target is to operationalize the old PNR railway up to Bicol by 2010.  Modernization activities will start in 2010.

 

Phase 2-P16.687  billion

 

(b) Phase 2-Rehabilitation of existing railway line from Lucena City to Legazpi City (345 kms.); and  
Phase 3-P12.778 billion (c) Phase 3-Construction of new railway extension line from Comun, Camalig, Albay to Matnog, Sorsogon (135 kms.). The project  includes the supply and installation of signaling and communication systems, and the acquisition of  rolling stocks. The rehabilitated line will allow train speed up to 120 kph , thus providing faster, safer and economical passenger train services to the Bicol Region.  

5. San Fernando-Oas Bypass Road (GMA Highway)

Location: Camarines Sur & Albay


P2.182 billion

 

The project is a 61.9 km. diversion road along the Maharlika Highway from the municipalities of San Fernando, Camarines Sur to Oas, Albay

The following road sections were completed in 2008:

 a. Bonifacio, San Fernando to Panoypoyan, Bula

 b. Panoypoyan, Bula to Tandaay, Nabua

 c. Tandaay, Nabua to Bonbon,  Libon

 d. Bonbon, Libon to Calzada, Oas

6. Catanduanes Circumferential Road Improvement Project

Location: Catanduanes

P1.556 billion

The project involves the improvement and concreting of a total of 200.184 kms. of national road Phase 1 is completed and inaugurated by PGMA last October 2007. Phase II will be implemented under the REAMP of the DPWH

7. Rehabilitation of Quirino Highway

Location: Quezon and Camarines Sur


P3.159 billion

Re-blocking and asphalt overlaying of the entire stretch of Quirino Highway (92 kms.) starting from the junction at Calauag, Quezon to Sipocot, Camarines Sur.

For CY 2008, P350 million was allocated for  asphalt overlaying/ reblocking of  3 sections:

a. Cam. Norte Section (P50.2 M)- 32.48%

b. Lupi-Sipocot Section (P150M)- 2.73%; Suspended as of Nov. 28 due to unworkable working condition.

c. Del Gallego-Ragay Section (P150M)- 57.76%.

8. Bicol Health Service Delivery Enhancement Program

Location: Regionwide

Involves the upgrading and equipping of the regional devolved health facilities The project was not favorably considered for grant aid for 2008 by the GOJ, per letter of NEDA-PIS Director to DOH dated June 6, 2008.

9. Geohazard Survey and Assessment

Location: Masbate,
Catanduanes, Albay and 7 Cities

 

A project of the Mines and Geosciences Bureau aimed at assessing the vulnerability of communities to geohazards.  This includes survey and production of geohazard maps in 1:50,000 scale.

For field mapping and survey, 17 municipalities in Masbate, one municipality in Albay, and 478 barangays region-wide were assessed-265.56% of target for 2008

Disseminated 2041 geohazard maps- 204.10% of target for 2008

Advisories rendered to 18 municipalities (100%) and 474 barangays (263.33% of target for 2008).       

Six seminar/ workshops (100% of target) were conducted.

Comprehensive Disaster Prevention Around Mayon Volcano

Location: Albay

Master plan and feasibility study preparation and project implementation; Provision of structural and non-structural measures. The feasibility study is for updating.

 