Title/Location/ Project Cost |
Description |
Status (as of EO December 2008) |
|
1. RORO Ports Along the Central/ Eastern Nautical
Highways |
|
|
|
|
|
On-going; 27% completed |
|
|
|
Completed |
|
|
|
80% completed as of 10/25/08 |
|
|
Port development |
80% completed as of 10/25/08 |
|
e.
Boca Engano,
Burias,Masbate
P80.00 million |
|
Proposed |
|
f.
Pantao Port, Libon, Albay |
Construction of single phase primary line extension |
100% completed |
|
g.
Pioduran Port, Albay |
|
|
|
h.
Aroroy Port,
Masbate
P97 million |
Port development |
100% completed |
|
i.
Pilar Port,
Sorsogon
P120 million |
|
Proposed |
|
j.
Esperanza Port,
Masbate
P80 million |
Port development |
97.884% as of 11/25/2008; damaged by typhoon |
|
k.
Cawayan Port, Masbate |
Construction of RORO facilities |
99.88% as of 06/25/08; damaged by typhoon |
|
l . San Andres
Port, Catanduanes |
|
Proposed |
|
m
. Sangay Port, Camarines Sur |
|
Proposed |
|
n
.San Vicente, Camarines Sur |
|
Proposed |
|
2. Bicol River Basin and Watershed Management
Project
Location: Camarines Sur, Albay and Camarines Norte
|
The project will pilot a comprehensive development
program on natural resources management and water
resources projects within the context of a river
basin planning management. It has 4 major
components: |
|
| |
a.
Institutional Development |
Revised proposal on this component was presented to
the ICC-Technical Board meeting on April 24, 2008 |
|
P930.851 million |
b.
Watershed Management and
Development |
The revised document was presented to the joint ICC-Cabinet
Committee and TB meeting on Nov. 5, 2008.
Based on the comments of the ICC, DENR submitted a
revised proposal to NEDA Region 5 for evaluation.
The evaluation report was forwarded by NEDA-PIS to
DENR-FASPO for consideration of the issues and
recommendations |
|
P2.124 billion |
c.
Flood and Hazard Mitigation |
Presented to the ICC-TB meeting on April 24,
2008;approved by the ICC-CC on May 15, 2008;
confirmed by the NEDA Board on June 3, 2008. |
|
P231.677 million |
|
Approved by the ICC-CC on December 13, 2007 as part
of the National Irrigation Administration's (NIA)
Participatory Irrigation Dev't Prroject package for
financing under the APL of the WB. |
|
3. Bicol Int'l Airport,
Location: Daraga, Albay
P3.440 billion
|
Construction of a new Legazpi Airport of
international standards |
On-going parcellary survey |
|
4. Bicol Mainline South Railway Project
Location: Laguna, Quezon, Camarines Sur, Albay,
Sorsogon
Catanduanes
P1.556 billion |
The entire project is proposed to be implemented in
three phases: (a) Phase 1- Rehabilitation of
existing railway line from Calamba to Lucena City
(77 kms.);
|
The target is to operationalize the old PNR railway
up to Bicol by 2010. Modernization activities will
start in 2010.
|
|
Phase 2-P16.687 billion |
(b) Phase 2-Rehabilitation of existing railway line
from Lucena City to Legazpi City (345 kms.); and |
|
|
Phase 3-P12.778 billion |
(c) Phase 3-Construction of new railway extension
line from Comun, Camalig, Albay to Matnog, Sorsogon
(135 kms.). The project includes the supply and
installation of signaling and communication systems,
and the acquisition of rolling stocks. The
rehabilitated line will allow train speed up to 120
kph , thus providing faster, safer and economical
passenger train services to the Bicol Region. |
|
|
5. San Fernando-Oas Bypass Road (GMA Highway)
Location: Camarines Sur & Albay
P2.182 billion
|
The project is a 61.9 km. diversion road along the
Maharlika Highway from the municipalities of San
Fernando, Camarines Sur to Oas, Albay |
The following road sections were completed in 2008:
a. Bonifacio, San
Fernando to Panoypoyan, Bula
b. Panoypoyan,
Bula to Tandaay, Nabua
c. Tandaay, Nabua
to Bonbon, Libon
d.
Bonbon, Libon to Calzada, Oas |
|
6. Catanduanes
Circumferential Road Improvement Project
Location: Catanduanes
P1.556 billion |
The project involves the improvement and concreting
of a total of 200.184 kms. of national road |
Phase 1 is completed and inaugurated by PGMA last
October 2007. Phase II will be implemented under the
REAMP of the DPWH |
|
7. Rehabilitation of Quirino Highway
Location: Quezon and Camarines Sur
P3.159 billion |
Re-blocking and asphalt overlaying of the entire
stretch of Quirino Highway (92 kms.) starting from
the junction at Calauag, Quezon to Sipocot,
Camarines Sur. |
For CY 2008, P350 million was allocated for asphalt
overlaying/ reblocking of 3 sections:
a. Cam. Norte Section (P50.2 M)- 32.48%
b. Lupi-Sipocot Section (P150M)- 2.73%; Suspended as
of Nov. 28 due to unworkable working condition.
c. Del Gallego-Ragay Section (P150M)- 57.76%. |
|
8. Bicol Health Service Delivery Enhancement Program
Location: Regionwide |
Involves the upgrading and equipping of the regional
devolved health facilities |
The project was not favorably considered for grant
aid for 2008 by the GOJ, per letter of NEDA-PIS
Director to DOH dated June 6, 2008. |
|
9. Geohazard Survey and Assessment
Location: Masbate,Catanduanes,
Albay and 7 Cities
|
A project of the Mines and Geosciences Bureau aimed
at assessing the vulnerability of communities to
geohazards. This includes survey and production of
geohazard maps in 1:50,000 scale. |
For field mapping and survey, 17 municipalities in
Masbate, one municipality in Albay, and 478
barangays region-wide were assessed-265.56% of
target for 2008
Disseminated 2041 geohazard maps- 204.10% of target
for 2008
Advisories rendered to 18 municipalities (100%) and
474 barangays (263.33% of target for 2008).
Six seminar/ workshops (100% of target) were
conducted. |
|
Comprehensive Disaster Prevention Around Mayon
Volcano
Location: Albay |
Master plan and feasibility study preparation and
project implementation; Provision of structural and
non-structural measures. |
The feasibility study is for updating. |