Department of Agriculture| |
Department of Agrarian Reform |
Agency: Department of Agriculture
|
Title |
Des-
cription |
Target
Beneficiaries/
Location |
Cost of
Reha-bilitation
(Php M) |
Source of
Funds |
Imple-
menting
Agencies |
|
Ginintuang Masa-ganang
Ani (GMA) Program for
Rice |
Provision of
certified
seeds, organic
fertilizer,
handtractor, livelihood
training and
IEC matls |
27,189
- Bicol Region
5,626 - Albay
2,251 - Cam. Norte
4,701 - Cam. Sur
3,960 - Catanduanes
4,320 - Masbate
6,331 - Sorsogon |
12.00
3.3,00
1.2,00
3.00
1.00
1.50
2.00 |
CARE |
DA/LGU |
|
Ginintuang Masaganang
Ani (GMA) Program for
Corn |
Provision of OPV corn
seeds, organic
fertilizer, postharvest,
equipment, livelihood
training and IEC
materials |
32,910
- Bicol Region
8,164 - Albay
1,222 - Cam. Norte
3,709 - Cam. Sur
2,910 - Catanduanes
11,925 - Masbate
4,980 - Sorsogon |
23.00
10.00
0.50
5.30
0.30
6.00
0.90 |
CARE |
DA/LGU |
|
Ginintuang Masaganang
Ani (GMA) Program for
High Value Commercial
Crops |
Provision of assorted
vegetable seeds, organic
fertilizer, assorted
fruit trees planting
materials, garden tools,
and livelihood training
& IEC matls |
720,152 - Bicol
125,025 - Albay
52,222 - Cam. Norte
236,725 - Cam. Sur
107,270 - Catanduanes
96,695 - Masbate
100,215 - Sorsogon |
60.00
10.90
5.40
19.90
7.90
7.90
8.00 |
CARE |
DA/LGU |
|
Ginintuang Masaganang
Ani (GMA) Program for
Livestock |
Provision of farm
animals, goats,
biologics, livelihood
training & IEC matls |
29,041 - Bicol Region
3,325 - Albay
1,020 - Cam. Norte
4,750 - Cam. Sur
7,592 - Catanduanes
5,680 - Masbate
6,674 - Sorsogon |
25.00
4.00
2.00
9.00
2.00
3.00
5.00 |
CARE |
DA/LGU |
|
Abaca Rehabilitation
Projec |
Provision of abaca
planting, post harvest
facilities and piloting
of abaca technology |
2,515 - Bicol Region
606 - Albay
379 - Cam. Sur
1,530 - Catanduanes |
10.00
3.00
2.00
5.00 |
CARE |
DA/LGU |
|
Coconut Rehabilitation
Project |
Provision of coconout
seedlings for planting/
replanting/
intercropping/
livestock and
fertilization |
15,740
- Bicol Region
8,025 - Albay
1,050 - Cam. Norte
1,850 - Cam. Sur
450 - Catanduanes
1,050 - Masbate
3,315 - Sorsogon |
55.00
30.00
3.00
5.50
1.50
3.00
12.00 |
CARE |
DA/LGU |
|
Fisheries Rehabilitation
Project |
Provision of coconout
seedlings for planting/
replanting/
intercropping/
livestock and
fertilization |
24,468 - Bicol Region
3,380 - Albay
3,680 - Cam. Norte
3,433 - Cam. Sur
2,324 - Catanduanes
1,243 - Masbate
10,408 - Sorsogon |
30.00
5.00
2.00
8.50
5.00
3.00
|
CARE |
DA/LGU |
|
Rehab/Repair of Farm to
market roads |
repair, regravelling |
3,437 - Bicol Region
1,852 - Albay
288 - Cam. Norte
167 - Catanduanes
100 - Masbate
1,030 - Sorsogon |
80.99
55.59
5.99
5.99
3.99
11.59 |
CARE |
DA/LGU |
|
Support to
Resettlements'
Livelihood Project |
|
Albay |
80.99 |
CARE |
DA/LGU |
|
Total |
|
855,454 |
375.00 |
|
|
back to top
Agency: Department of Agrarian
Reform
|
Title |
Des-
cription |
Target
Beneficiaries/
Location |
Cost of
Reha-bilitation
(Php M) |
Source of
Funds |
Imple-
menting
Agencies |
|
ALBAY - SECOND
DISTRICT |
|
DARAGA |
|
Rehab Malabog-Lacag
FMR |
2.692 kms. |
2,888 |
3.500 |
CARE |
DAR |
|
Rehab
Bascaran-Talahib FMR |
1.346 kms. |
1,614 |
3.000 |
CARE |
DAR |
|
Rehab
Inarado-Alobo-Mabini
FMR |
- |
1,332 |
8.500 |
CARE |
DAR |
|
Rehab
Gabawan-Kiwalo-Bagumbayan
FMR |
5.000 kms. |
2,617 |
11.00 |
CARE |
DAR |
|
Rehab
Malabog-Gulanggulang-Busay
FMR |
1.500 kms. |
2,877 |
1.875 |
CARE |
DAR |
|
Rehab of Mayon-San
Ramon-Bigao-San
Vicente Grande FMR |
9.628 kms. |
4,574 |
2.050 |
CARE |
DAR |
|
Construction of San
Ramon-So. Tobtobon
Road |
2.918 kms. |
1,033 |
2.000 |
CARE |
DAR |
|
CAMALIG |
|
Caguiba-Quitinday
FMR |
2.500 kms. |
1,136 |
4.100 |
CARE |
DAR |
|
Iluluan-Manawan FMR |
2.500 kms.
|
2,500 |
3.125 |
CARE |
DAR |
|
Pariaan-Binanderahan
FMR |
2.000 kms. |
1,267 |
3.500 |
CARE |
DAR |
|
Palanog-Miti-Iluluan
FMR |
3.100 kms. |
1,923 |
4.650 |
CARE |
DAR |
|
Quirangay-Sua-Tumpa
FMR |
2.000 kms. |
2,266 |
4.250 |
CARE |
DAR |
|
Ligban-Gotob-Taladong
FMR |
4.100 kms. |
1,291 |
5.125 |
CARE |
DAR |
|
Cotmon-Maninila-Taplacon-Taloto
FMR |
7.200 kms. |
2,873 |
8.700 |
CARE |
DAR |
|
Panoypoy-Magogon FMR |
2.000 kms. |
1,238 |
3.500 |
CARE |
DAR |
|
LEGAZPI CITY |
|
Lamba-Maslog FMR |
2.500 kms. |
1,183 |
3.000 |
CARE |
DAR |
|
Maticol-Estanza FMR |
1.000 kms. |
1,659 |
1.500 |
CARE |
DAR |
|
Dita-San Joaquin-Naipit
FMR |
2.000 kms. |
1,485 |
2.500 |
CARE |
DAR |
|
Taysan-Malanka-Guyam
FMR |
3.000 kms. |
2,388 |
3.500 |
CARE |
DAR |
|
Imalnod-Bascaran FMR |
1.500 kms. |
764 |
2.000 |
CARE |
DAR |
|
Lumpayao-Bagacay FMR |
3.000 kms. |
1,393 |
4.000 |
CARE |
DAR |
|
Lumpayao-Bagacay FMR |
3.000 kms. |
1,393 |
4.000 |
CARE |
DAR |
|
Homapon-Baban-Mariawa
FMR |
2.000 kms. |
1,868 |
3.000 |
CARE |
DAR |
|
San Francisco-Alabang-Baybay
FMR |
2.000 kms. |
673 |
2.500 |
CARE |
DAR |
|
Bariis-Sagrada
Familia FMR |
1.500 kms. |
432 |
2.000 |
CARE |
DAR |
|
MANITO |
|
Construction of
Cabacongan WS Level
II |
1 unit |
2,470 |
0.500 |
CARE |
DAR |
|
So. Putsan-Calpi
Road |
3.589 kms. |
1,677 |
1.000 |
CARE |
DAR |
|
Calpi-Danao Road |
7.580 kms. |
1,118 |
1.000 |
CARE |
DAR |
|
SUB-TOTAL |
|
49,321 |
95,877.50 |
|
|
|
ALBAY - SECOND
DISTRICT |
|
GUINOBATAN |
|
Rehab of
Mauraro-Mapaco Road |
3.000 kms. |
2,290 |
3.000 |
CARE |
DAR |
|
Rehab of Purok
2-Baligang Road |
5.400 kms. |
1,234 |
3.232291 |
CARE |
DAR |
|
Rehab of Purok
3-Binanowan Road |
1.400 kms. |
852 |
0.975833 |
CARE |
DAR |
|
Repair of Muladbucad
Pequeño Bridge |
8 LM |
1,000 |
2.000 |
CARE |
DAR |
|
LIBON |
|
San Antonio-San
Ramon FMR |
1.000 kms. |
1,053 |
1.500 |
CARE |
DAR |
|
Sitio
Calambay-Bulusan FMR |
1.000 kms. |
1,759 |
1.500 |
CARE |
DAR |
|
So. La Medalla-So.
Cadacad-Bonbon FMR |
2.000 kms. |
1,643 |
2.500 |
CARE |
DAR |
|
So.
Divisoria-Alongong
FMR |
1.500 kms. |
535 |
1.500 |
CARE |
DAR |
|
Magallanes-Niño
Jesus FMR |
1.000 kms. |
851 |
2.000 |
CARE |
DAR |
|
OAS |
|
Camagong-Calpi FMR |
3.000 kms. |
1,184 |
6.500 |
CARE |
DAR |
|
Camagong-Gumabao FMR |
3.000 kms. |
983 |
5.750 |
CARE |
DAR |
|
Banao-Coliat FMR |
2.000 kms. |
1,117 |
4.500 |
CARE |
DAR |
|
Oas-Mabayawas-Del
Rosario-Ramay Road
Section |
5.000 kms. |
1,423 |
10.000 |
CARE |
DAR |
|
So. Macoto-Cagmanaba
FMR |
1.500 kms. |
1,299 |
1299 |
CARE |
DAR |
|
Taba-Taba-Saban FMR |
1.500 kms. |
1,252 |
1.875 |
CARE |
DAR |
|
Rehab of Balogo-Pena
Road |
2.847 kms. |
1,235 |
1.750 |
CARE |
DAR |
|
Const. of
Balogo-Parina-Labadami
via Cabugao Road |
5.474 kms. |
860 |
3.500 |
CARE |
DAR |
|
POLANGUI |
|
Construction of
Balinad-So. Garayon
Road |
3.003
kms. |
1,561 |
0.550 |
CARE |
DAR |
|
Construction of
Balinad-Hacienda
Road |
5.540
kms. |
1,560 |
0.500 |
CARE |
DAR |
|
PIODURAN |
|
Construction of
Caratagan-Barangay 1
Road |
3.000
kms. |
2,812 |
1.050 |
CARE |
DAR |
|
Construction of La
Medalla-Banawan Road |
2.540
kms. |
3,961 |
2.000 |
CARE |
DAR |
|
JOVELLAR |
|
Rehab of
Jovellar-Banuang
Gurang Road |
2.500 kms. |
538 |
5.000 |
CARE |
DAR |
|
Cont. of Jovellar-Villa
Paz Road |
2.500 kms. |
856 |
5.000 |
CARE |
DAR |
|
Rehab of
Bagacay-Medalla Road |
2.500 kms. |
1,315 |
5.000 |
CARE |
DAR |
|
Const. of Jovellar-San
Isidro Road |
2.500 kms. |
1,013 |
5.000 |
CARE |
DAR |
|
Rehab of Estrella-San
Vicente Road |
2.500 kms. |
1,312 |
5.000 |
CARE |
DAR |
|
Rehab of
Cabraran-Maogog Road |
2.500 kms. |
1,874 |
5.000 |
CARE |
DAR |
|
Const. of Brgy.
Quitinday-White Deer
RCDG Bridge |
20.0 l.m. |
912 |
5.000 |
CARE |
DAR |
|
Construction of
Maogog Bridge |
20.0 l.m. |
1,196 |
5.000 |
CARE |
DAR |
|
SUB-TOTAL |
|
39,480 |
98.058124 |
|
|
|
STO. DOMINGO |
|
Construction of
Bical, Salvacion-San
Andres Road |
7.200 kms. |
1,794 |
14.400 |
CARE |
DAR |
|
MALINAO |
|
Construction of
Comun-Soa RCDG
Bridge |
180 l.m. |
2,108 |
3.500 |
CARE |
DAR |
|
Tanawan-Tagoytoy
Road |
2.500 kms. |
1,678 |
5.500 |
CARE |
DAR |
|
Balza-Bakyad FMR |
2.000 kms. |
1,713 |
4.000 |
CARE |
DAR |
|
Ogob-Diaro FMR |
4.000 kms. |
1,585 |
9.000 |
CARE |
DAR |
|
Ogob Steel Bridge |
55 l.m. |
2,363 |
5.000 |
CARE |
DAR |
|
Cluster A Water
System covering 13
barangays |
13 units |
- |
5.000 |
CARE |
DAR |
|
Cluster B Water
System covering 5
barangays |
5 units |
- |
2.500 |
CARE |
DAR |
|
Cluster C Water
System covering 5
barangays |
5 units |
|
2.000 |
CARE |
DAR |
|
Tagoytoy Level II
Water System |
1 unit |
1,974 |
1.000 |
CARE |
DAR |
|
TIWI |
|
Construction of
Mayong/Dapdap WS
Level II |
1 unit |
2,743 |
0.400 |
CARE |
DAR |
|
Repair of CARP
Development Center |
1 unit |
1,200 |
2.000 |
CARE |
DAR |
|
Repair/Rehailitation
of DARPO and DARMO |
|
400 |
3.6977 |
CARE |
DAR |
|
Offices and
Acquisition of
Office Equipments
and Furnitures and
Fixtures |
|
|
|
|
|
|
SUB-TOTAL |
|
22,823 |
60.497 |
|
|
|
TOTAL |
|
106,359 |
254.430824 |
|
|
|
CAMARINES NORTE |
|
ARC CAAYUNAN,
BASUD |
|
Construction of
Caayunan
Multi-Purpose
Cooperative |
2-storey
building with
floor area of
6mX7m
|
Caayunan
Multi-
Purpose
Cooperative
(CMPC) Caayunan,
Basud |
0.700 |
CARE |
DAR-by contract |
|
Pineapple
Processing |
Additional
Working Capital
for Pineapple |
Caayunan
Multi-
Purpose
Cooperative
(CMPC) Caayunan,
Basud |
0.05 |
CARE |
DAR-BDCD |
|
Support to
Pineapple
Production
Project |
20 hectares to
be planted to
pineapple
production.
Production
support includes
cost of
fertilizers,
chemicals and
planting
materials. |
30 ARBs/Brgys.
Caayunan, San
Felipe and Plaridel |
8.500 |
CARE |
DAR-BDCD |
|
ARC MATNOG,
BASUD |
|
Construction of
Pathway |
150 meters X 1.5
meters pathway
from Purok 1
Mampili, Basud
to Purok 2, Brgy.
Mambalite, Daet |
Farmers and
residents of Brgy.
Mampili and
Brgy.
Mambalite |
0.500 |
CARE |
DAR-by contract |
|
ARC MAGSAYSAY,
CAPALONGA |
|
Reconstruction
of Multi-Purpose
Center &
Warehouse for
Capalonga
Agrarian Reform
Beneficiaries
Cooperative (CARBECO) |
Multi-Purpose
Building with
floor area of 8m
X 16m
|
CARBECO |
0.800 |
CARE |
DAR-by contract |
|
Coconut and
Copra Trading |
Additional
Working Capital |
CARBECO |
0.050 |
CARE |
DAR-BDCD |
|
Construction of
One (1) unit
Solar Dryer |
15 X 30 sq. m. |
Farmers in the
ARC |
0.200 |
CARE |
DAR-by contract |
|
ARC CABILANG,
DAET |
|
Coconut
Rehabilitation
Program |
50 hectares for
replanting
program.
Rehab costs
includes cost of
planting
materials and
fertilizer |
50 ARBs/CLOA
holders of Brgys.
Calasgasan,
Bibirao,
Dogongan |
0.300 |
CARE |
DAR and PCA |
|
ARC SAN PEDRO,
JOSE PANGANIBAN |
|
Construction of
Multi-Purpose
Building for San
Pedro Agrarian
Reform
Beneficiaries
Multi-Purpose
Cooperative (SEFMPC) |
1-Storey
building with
floor area of
8mX16m |
ARBs of San
Pedro and
San
Martin and members
of SPARBMPC |
0.700 |
CARE |
DAR-by contract |
|
Coconut and
Copra Trading |
Additional
working capital
|
Coconut farmers
of the ARC |
0.050 |
CARE |
DAR-BDCD |
|
Coconut
Rehabilitation
Program |
50 hectares for
replanting
program
Rehab costs
includes cost of
planting
materials and
fertilizer |
50 CLOA holders
will
be the
priority proponent
from brgys San Pedro,
San Rafael and
San Martin |
0.300 |
CARE |
DAR and PCA |
|
ARC LUGUI, LABO |
|
Coconut
Rehabilitation
Program |
50 hectares for
replanting
program
Rehab costs
includes cost of
planting
materials and
fertilizer |
50 CLOA holders
will
be the
priority
proponent
from brgys Iberica,
San
Antonio, Iberica |
0.300 |
CARE |
DAR and PCA |
|
Establishment of
Nursery and Bunk
House for
Coconut and
Fruit Trees |
Fully fenced
with barbed wire
measuring 10m x
20m and Bunk
House with floor
area of 3m x 5m.
Project cost
includes
planting
materials. |
ARBs of
Barangays
Iberica,
San
Antonio, Mabilo
1
and members of
BICPPPA |
0.200 |
CARE |
DAR |
|
Support to
Pineapple
Production
Project |
20 hectares to
be planted to
pineapple
production.
Production
support includes
cost of
fertilizers,
chemicals and
planting
materials |
30 ARBs/Brgys.
Iberica
and San
Antonio |
0.400 |
CARE |
DAR-BDCD |
|
ARC DAGUIT, LABO |
|
Coconut
Rehabilitation
Program |
100 hectares for
replanting
program Rehab
costs includes
cost of planting
materials and
fertilizer |
50 CLOA holders
will
be the
priority
proponent
from Brgys. Iberica,
San
Antonio |
0.600 |
CARE |
DAR-BDCD |
|
Establishment of
Nursery and Bunk
House for
Coconut and
Fruit |
Fully fenced
with barbed wire
measuring 10m x
20m and Bunk
House with floor
area of 3m x 5m.
Project cost
includes
planting
materials. |
ARBs of Brgyd.
Daguit,
Mal-Basud,
Macogon,
Talobatib and
members
of Daguit ARB
Association |
0.200 |
CARE |
DAR-BDCD |
|
ARC MANGUISOC/MAMBUNGALON,
MERCEDES |
|
Support to
Pineapple
Production
Project |
20 hectares to
be planted to
pineapple
production.
Production
support includes
cost of
fertilizers,
chemicals and
planting
materials |
20 CLOA holders
from
Brgys.
Gaboc,
Mambu-
ngalon and Cayucyucan |
0.400 |
CARE |
DAR |
|
NFA and
Commercial Rice
Trading |
Expansion of
Rice Trading in
other barangays
in the ARC |
ARC residents |
0.050 |
CARE |
DAR-BDCD |
|
Coconut
Rehabilitation
Program |
50 hectares for
replanting
program. Rehab
costs includes
cost of planting
materials and
fertilizer |
50 CLOA holders
will
be the
priority
proponent
from Brgys. Manguisoc,
Gaboc,
Mambungalon
and Cayucyucan |
0.300 |
CARE |
DAR and PCA |
|
ARC BATOBALANI,
PARACALE |
|
Construction of
Multi-Purpose
Center and
Warehouse for
BARCO |
Multi-Purpose
building with
floor area of
8mX16m and
warehouse
measuring 5mX5m |
Batobalani
Agrarian
Reform
Coop (BARCO) |
0.800 |
CARE |
DAR-by contract |
|
Copra and Coco
Trading |
Expansion of
Copra and Coco
Trading in
adjacent
barangays |
Coco farmers of
Capacuan
abd
adjacent barangays |
0.050 |
CARE |
DAR-BDCD |
|
ARC SAN ISIDRO,
SAN LORENZO RUIZ |
|
Reconstruction
of Warehouse for
Copra and
Handicraft
project of
SIARBECO |
Warehouse with
floor area of 8m
x 16m |
San Isidro
Agrarian
Reform
Beneficiaries
Cooperative (SIARBECO)
and residents of
ARC as
well as
residents of
adjacent barangays |
0.800 |
CARE |
DAR-by contract |
|
Coco Trading and
Handicraft
production |
Additional
Working Capital
for Coco Trading
and Handicraft |
Beneficiaries
Cooperative (SIARBECO)
and residents
of ARC as well
as residents
of adjacent
barangays |
0.050 |
CARE |
DAR-BDCD |
|
Support to Corn
and Cassava
Production
Project |
Corn - 5
Hectares
Cassava - 10
Hectares
Production
support includes
cost of farm
inputs |
San Isidro
Agrarian
Reform
Beneficiaries
Cooperative (SIARBECO)
and residents of
ARC as
well as
residents of
adjacent
barangays |
0.250 |
CARE |
DAR-BDCD |
|
Road Opening San
Isidro to San
Ramon FMR |
1.5 kilometers |
Barangay
Residents of
San Isidro and
San
Ramon |
1.400 |
CARE |
DAR-by contract |
|
ARC MAGCAISA,
SAN VICENTE |
|
Support to
Pineapple
Production
Project |
20 hectares to
be planted to
pineapple
production.
Production
support includes
cost of
fertilizers,
chemicals and
planting
materials |
Project
recipient are
25 ARB members
of
MAGCAISA
Multi-Purpose
Coop |
0.400 |
CARE |
DAR-BDCD |
|
Goat Raising
Project |
One packet is 1
Buck and 2 Does
per recipient |
20 CLOA Holders
from Barangays
San Jose,
Man-ogob and
Cabanbanan |
0.120 |
CARE |
DAR-BDCD |
|
ARC RIZAL
POBLACION, STA.
ELENA |
|
Establishment of
Nursery and Bunk
House for
Coconut and
Fruit Trees |
Fully fenced
with barbed wire
measuring 10m x
20m and Bunk
House with floor
area of 3m x 5m.
Project cost
includes
planting
materials.
Project site is
at Sitio Colong,
Poblacion |
The project will
benefit
the 115 members
of Sta.
Elena Farmers
Multi-
Purpose
Cooperative
(SEFMPC) |
0.200 |
CARE |
DAR-DTI and DOST |
|
Construction of
Cassava Kropek
Production
Center with
processing
equipments |
Production
Center with a
floor area of
6m x 12 m with
complete
processing
equipments and
additional
working capital |
The project will
benefit
the 115 members
of
Sta. Elena
Farmers
Multi-Purpose Cooperative (SEFMPC) |
0.530 |
CARE |
DAR-DTI and DOST |
|
Construction of
Warehouse for
Rice and Copra
with solar Dryer |
Warehouse with
floor area of 8m
x 16m and solar
dryer measuring
15x30sq.m
in Barangay
Rizal |
ARBs and rice
farmers in
barangay Rizal
and
adjacent
barangays |
0.500 |
CARE |
DAR-by contract |
|
Regravelling of
Purok 16 Sitio
Colong FMR |
2.0 Km road
regravelling at
Sitio Colong,
Poblacion |
ARC residents
and ARBs |
1.500 |
CARE |
DAR-by contract |
|
ARC MAULAWIN,
STA. ELENA |
|
Rehabilitation
of Multi purpose
Center for
Calauag ARBs
Multi-purpose
Cooperative (CARBsMPC) |
2 storey
building with
floor area of 6m
x 12m |
120 Coop members
and residents of
barangay
Maulawin |
0.800 |
CARE |
DAR-by contract |
|
ARC AGUIT-IT,
VINZONS |
|
Support to
Vegetable
Production
Project (Amplaya,
watermelon, okra
and pepper) |
30 hectares will
be utilized,
Production
support includes
the cost of farm
inputs |
50 ARBs and CLOA
holders of
barangays
Singi, Aguit-it
and
Matango are the
prospected
beneficiaries |
0.600 |
CARE |
DAR-BDCD |
|
Construction of
Nipa Wine
Production
Center with
Distilling
Equipments |
Production
Center with a
floor area of
6m x 8 m with
complete
distillery
equipments and
additional
working capital |
Project
proponent is
Singi, Aguit-it,
Manlucugan,
Matango
and Sabang
(SAMMSMPC) with
100 ARB members
and Nipa farmers |
0.400 |
CARE |
DAR-BDCD |
|
TOTAL |
|
|
15.000 |
|
|
|
CAMARINES SUR |
Rehabilitation/
Restoration of
Existing Post
Harvest
Facilities in
ARCs |
Repair of
existing PHF
provided to
different
Agrarian Reform
Communities in
Camarines Sur
that were
damaged by the
Typhoon Reming
1. Roofing
Materials
2. Ceiling Works
3. Repair of
Doors
4. Electrical
Works
5. Painting
Works
6. Provision of
Window Glass |
Tarum ARC,
Libmanan
Caranan ARC,
Pasacao
New MASSBA, BIAD
II Minalabac
Side
Tampadong ARC,
Pamplona
May-ogob ARC,
Ocampo
Hiwacloy-Pinaglabanan
ARC, Goa
San Isidro ARC,
Bula
Tinorongan ARC,
Sagñay
Sta. Maria ARC,
Iriga City
Burocbusoc ARC,
Buhi |
0.433
0.217
0.310
0.217
0.217
0.211
0.181
0.071
0.25
0.417 |
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE |
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR |
|
Sub-Total |
|
|
2.524 |
|
|
|
Rehabilitation/Restoration
of Existing Farm
to Market Road |
Regravelling/Resurfacing
of Washedout
Road Surface |
Timbang-Baliuag
Nuevo,Minalabac
Serranzana-Salvacion,
Sipocot
Mantilla-Mangga,
Sipocot
Salvacion-Aldezar,
Sipocot
North
Villazar-Tible,
Sipocot
Anib-Calampinay,
Sipocot
Mantilla-Serranzana,
Sipocot
Cabanbanan,
Calabanga
Binanuaanan
Pequeño,
Calabanga
Pinada,
Calabanga
Binanuaanan,
Pili
Aniog-Tinorongan,
Sagñay
Tandoc-Vito,
Siruma
San
Roque-Salvacion,
Tinambac
Magtang-Buenavista,
Tinambac
Buenavista-Union,
Tinambac
Tambo-Paskang,
Buhi
Tambo-Burocbusoc-Tubigan,
Buhi
Labawon-Makaangay,
Buhi
Tambo-Burocbusoc,
Buhi |
2.400
4,000
3.000
16,000
7.000
3.000
3.000
2.400
2.400
1.493
6.000
2.400
1.500
10.000
4.000
5.000
2.400
3.000
1.44-0
1.500 |
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE
CARE |
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR
DAR |
|
Sub-Total |
|
|
81.993 |
|
|
|
Agricultural
Production and
Livestock
Raising |
|
|
|
|
|
|
Off-season
Vegetable
Production |
Adoption of
off-season
vegetable
production
includes
provision of
seeds and other
planting
materials.
Technical
assistance will
be provided by
the Agricultural
Technicians from
the Municipal
Agriculture
Office and the
assigned expert
of the seed
company.
a. Ampalaya
b. Eggplant
c. Tomato
d. Bell Pepper
e. Hot Pepper
f. Upo
g. Papaya
h. Okra
I. Sitao
j. Sweet Corn |
10 ARC
Cooperators per
ARC Bahay,
Libmanan A
Tarum, Libmanan
B
F. Simeon, Ragay
Lourdes, Lupi
Tampadong-Veneracion,
Pamplona
Timbang,
Minalabac
Mantila, Sipocot
Caranan, Pasacao
BIAD II
Minalabac & Bula
Side
Bagong Sirang,
Pili
Binobong-Tagbong,
Pili
Pinit, Ocampo
May-ogob, Ocampo
Cararayan-Pacol-San
Isidro, Naga
Camuning,
Calabanga
San Antonio,
Bombon
Cabugao, Milaor
Pag-asa,
Tinambac
Bolaobalite,
Tinambac
Coyaoyao-Tinawagan,
Tigaon
Agpo-Amoguis-San
Ramon Cluster,
Lagonoy
Hiwacloy-Pinaglabanan,
Goa
Matacla, Goa
Tinorongan,
Sagñay
Danlog, San Jose
Antipolo-Divino
Rostro, Buhi
Burocbusoc, Buhi
San Antonio,
Buhi
Laganac, Balatan
Sta. Maria,
Iriga City
Lanipga, Bula
Sto. Niño, Bula
Agdangan-San
Rafael, Baao |
Cost of
vegetable
production per
500 sq. meters
Ampalaya
0.160
Eggplant
0.150
Tomato
0.140
Bell Pepper
0.150
Hot Pepper
0.150
Upo
0.150
Papaya
0.150
Okra
0.140
Sitao
0.170
Sweet Corn
0.070
|
CARE |
DAR |
|
Sub-Total |
|
|
4.290 |
|
|
|
Organic Growing
of Native
Chicken |
Upgrading
project
introduces large
breed of chicken
to raise
indigenous breed |
20 recipients
per ARC
Bahay, Libmanan
A
Tarum, Libmanan
B
F. Simeon, Ragay
Lourdes, Lupi
Tampadong-Veneracion,
Pamplona
Timbang,
Minalabac
Mantila, Sipocot
Caranan, Pasacao
BIAD II
Minalabac & Bula
Side
Bagong Sirang,
Pili
Binobong-Tagbong,
Pili
Pinit, Ocampo
May-ogob, Ocampo
Cararayan-Pacol-San
Isidro, Naga
Camuning,
Calabanga
San Antonio,
Bombon
Cabugao, Milaor
Pag-asa,
Tinambac
Bolaobalite,
Tinambac
Coyaoyao-Tinawagan,
Tigaon
Agpo-Amoguis-San
Ramon Cluster,
Lagonoy
Hiwacloy-Pinaglabanan,
GoaMatacla, Goa
Tinorongan,
Sagñay
Danlog, San Jose
Antipolo-Divino
Rostro, Buhi
Burocbusoc, Buhi
San Antonio,
Buhi
Laganac, Balatan
Sta. Maria,
Iriga City
Lanipga, Bula
Sto. Niño, Bula
Agdangan-San
Rafael, Baao
|
Php 2,500 per
packet
of 15 heads hen
and
2 rooster |
CARE |
DAR |
|
Sub-Total |
|
|
1.700 |
|
|
|
Goat Raising |
Provision of
five (5) does
per recipient
and one (1) buck
per ARC. This is
an alternative
to swine raising
as an income
generating
opportunity and
possible option
to fight
malnutrition
among school age
children. A
technical
training will be
conducted to
project
cooperators. |
CocFive (5)
cooperators per
ARC
Bahay, Libmanan
A
Tarum, Libmanan
B
F. Simeon, Ragay
Lourdes, Lupi
Tampadong-Veneracion,
Pamplona
Timbang,
Minalabac
Mantila, Sipocot
Caranan, Pasacao
BIAD II
Minalabac & Bula
Side
Bagong Sirang,
Pili
Binobong-Tagbong,
Pili
Pinit, Ocampo
May-ogob, Ocampo
Cararayan-Pacol-San
Isidro, Naga
Camuning,
Calabanga
San Antonio,
Bombon
Cabugao, Milaor
Pag-asa,
Tinambac
Bolaobalite,
Tinambac
Coyaoyao-Tinawagan,
Tigaon
Agpo-Amoguis-San
Ramon Cluster,
Lagonoy
Hiwacloy-Pinaglabanan,
Goa
Matacla, Goa
Tinorongan,
Sagñay
Danlog, San Jose
Antipolo-Divino
Rostro, Buhi
Burocbusoc, Buhi
San Antonio,
Buhi
Laganac, Balatan
Sta. Maria,
Iriga City
Lanipga, Bul
Sto. Niño, Bula
Agdangan-San
Rafael, Baao |
Php 25T per
packet of 5 does
and 1 buck |
CARE |
DAR |
|
Sub-Total |
|
|
4.250 |
|
|
|
Micro-Finance/Trading
Capital Infusion |
One of the major
constraints to
the
establishment of
enterprises
among ARBs is
lack of access
to credit. Most
of the ARBs are
discouraged to
avail of capital
because of lot
of documentary
requirements of
formal credit
institutions.
Cognizant of the
immediate income
opportunities
that can be
derived from
micro enterprise
such as vending,
establishment of
sari-sari store
and other
economic
endeavors that
yield immediate
return, it is
proposed that a
micro finance
project be
established for
the specific of
the ARB
households who
were greatly
affected by
Typhoon Reming.
A credit limit
ranging from
Php5,000.00 to
Php 10,000.00
shall be
extended to
needy ARB
households to
enable them to
engage in
gainful
activities
meantime that
their crops have
been devastated.
|
20,537 ARBs in
35
Municipalities
and 2 cities of
Camarines Sur |
6.800 |
CARE |
DAR |
|
Sub-Total |
|
|
6.800 |
|
|
|
Administrative
and Operating
Expenses |
|
|
1.000 |
CARE |
DAR |
|
Sub-Total |
|
|
1.000 |
|
|
|
TOTAL |
|
|
102.497 |
|
|
|
Regravelling of
Purok 16 Sitio
Colong FMR |
2.0 Km road
regravelling at
Sitio Colong,
Poblacion |
ARC residents
and ARBs |
1.500 |
CARE |
DAR-by contract |
|
CATANDUANES |
|
ARC BAGONG SIGLO,
BATO |
|
Repair of
Handmade Paper
Production
Center |
Repair of
heavily damaged
Production
Center
Provision od\f
working capital |
ARC Bagong Siglo,
Bato,
Catanduanes |
0.050
0.050 |
CARE
CARE |
DAR/DTI
DAR/DTI |
|
Abaca
Rehabilitation |
Provision of
Abaca Suckers |
ARC Bagong Siglo,
Bato,
Catanduanes |
0.075 |
CARE |
DA-DA-DENR |
|
Vegetable
Production |
Provision of
vegetable seeds |
ARC Bagong Siglo,
Bato,
Catanduanes |
0.020 |
CARE |
DAR-LGU-PVO |
|
Livestock
Raising and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
Carabao (10
heads)
Provision of
Sasso chicken
(150 heads) |
ARC Bagong Siglo,
Bato
|
0.020
0.200
0.0075 |
CARE |
DAR-LGU-PVO
|
|
Coconut
Production |
Provision of
planting
materials &
inputs |
ARC Bagong Siglo,
Bato, |
0.900 |
CARE |
DAR-DA-DENR |
|
Sub-Total |
|
|
1.3225 |
|
|
|
CAMALAYAN, BARAS |
|
Repair of
Cooperative
Building |
Repair of
heavily damaged
cooperative
production
center and
office |
ARC Camalayan,
Baras |
0.050 |
CARE |
DAR-LGU |
|
Coconut
Rehabilitation |
Provision of
planting
materials &
inputs |
ARC Camalayan,
Baras |
0.900 |
CARE |
DA-DAR-LGU |
|
Abaca
Rehabilitation |
Provision of
Abaca Suckers &
working capital |
ARC Camalayan,
Baras |
0.150 |
CARE |
DAR-DA-DENR |
|
Rice Production |
Provision of
hybrid/certified
rice seeds and
other inputs |
ARC Camalayan,
Baras |
0.200 |
CARE |
DAR-DA-PASO |
|
Vegetable
Production |
Provision of
vegetable seeds
& other inputs |
ARC Camalayan,
Baras |
0.020 |
CARE |
DA-DAR |
|
Livestock
Raising and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
Carabao (10
heads)
Provision of
Sasso chicken
(100 heads)
|
ARC Camalayan,
Baras |
0.030
0.200
0.010 |
CARE |
DAR-LGU-PVO |
|
Sub-Total |
|
|
1.550 |
|
|
|
ARC BIONG,
GIGMOTO |
|
Repair of
production
center/cooperative
office |
Repair of
heavily damaged
cooperative
office/production
center |
ARC Biong,
Gigmoto |
0.050 |
CARE |
DAR, Coop |
|
Fish Pond |
Repair of newly
establish
fishpond and
provision of
fingerlings and
feeds |
ARC Biong,
Gigmoto |
0.029 |
CARE |
Coop, DAR, PASO |
|
Rice Production |
Provision of
certified/hybrid
rice seeds and
other inputs |
ARC Biong,
Gigmoto |
0.100 |
CARE |
DAR, DA, LGU |
|
Abaca
Rehabilitation |
Provision of
Abaca Suckers |
ARC Biong,
Gigmoto |
0.765 |
CARE |
DA, DAR, DENR |
|
Vegetable
Production and
Cash Crops |
Provision of
vegetable seeds
& seedlings |
ARC Biong,
Gigmoto |
0.020 |
CARE |
DAR, DA, LGU |
|
Livestock
Raising and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
Carabao (10
heads)
Provision of
Sasso chicken
(100 heads) |
ARC Biong,
Gigmoto |
0.03
0.200
0.010 |
CARE |
DAR, LGU, PVO |
|
Coconut
Production |
Provision of
planting
materials &
other input
materirals |
ARC Biong,
Gigmoto |
0.440 |
CARE |
DA-DAR-DENR |
|
Sub-Total |
|
|
1.635 |
|
|
|
ARC BATONG
PALOWAY, SAN
ANDRES |
|
Repair of Abaca
Rug Carpet
Center |
Re-construction
of totally
damaged 5 units
rug carpet
production
center in five
brgys. (Batong
Paloway, Lictin,
Rizal, San Jose,
Yocti)
Repair of seven
(7) units
handloom
Provision of
working capital |
ARC Batong
Paloway |
0.500
0.140
0.399 |
CARE |
DAR-DTI-LGU
DAR-PASO |
|
Abaca
Rehabilitation |
Provision of
Abaca Suckers |
ARC Batong
Paloway |
0.975 |
CARE |
DA-DAR-DENR |
|
Vegetable
Production
|
Provision of
vegetable seeds
|
ARC Batong
Paloway |
0.070 |
CARE |
DAR-DA-LGU |
|
Livestock
Raising and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
ARC Batong
Paloway |
0.025
0.200
0.010 |
CARE |
DAR-LGU-PVO |
|
Rice Production |
Provision of
certified/hybrid
seeds |
ARC Batong
Paloway |
0.300 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
2.520 |
|
|
|
ARC BISCAB, SAN
ANDRES |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
ARC BISCAB, San
Andres |
0.025
0.200
0.010 |
CARE |
DAR-PVO-LGU |
|
Lasa
Rehabilitation |
Provision of
working capital |
ARC BISCAB, San
Andres |
0.200 |
CARE |
DAR-PASO-LGU |
|
Coconut
Production |
Provision of
planting
materials &
other input
materirals |
ARC BISCAB, San
Andres |
0.300 |
CARE |
DA-DAR-DENR |
|
Abaca
Rehabilitation |
Provision of
planting
materials &
working capital |
ARC BISCAB, San
Andres |
0.159 |
CARE |
DA-DAR-DENR |
|
Vegetable
Production |
Provision of
vegetable seeds
& inputs |
ARC BISCAB, San
Andres |
0.020 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
0.950 |
|
|
|
ARC MACABULUHAN,
SAN ANDRES |
|
Lasa
Rehabilitation |
Provision of
working capital
& planting
materials |
ARC Macabuluhan,
San Andres |
0.250 |
CARE |
DAR-PASO-LGU |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
|
ARC Macabuluhan,
San Andres |
0.025
0.200 |
CARE |
DAR-LGU-PVO |
|
Coconut
Rehabilitation |
Provision of
planting
materials |
ARC Macabuluhan,
San Andres |
0.100 |
CARE |
DA-PCA-DAR |
|
Vegetable
Production |
Provision of
vegetable seeds |
ARC Macabuluhan,
San Andres |
0.020 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
0.375 |
|
|
|
BURAC WEST |
|
Abaca
Rehabilitation |
Provision of
planting
materials and
working capital |
Burac West |
0.375 |
CARE |
DA-DAR-DENR |
|
Coconut
Rehabilitation |
Provision of
planting
materials and
working capital |
Burac West |
0.360 |
CARE |
DA-DAR-DENR |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
Burac West |
0.025
0.200
0.010
|
CARE |
DAR-PVO-LGU |
|
Vegetable/Cashcrops |
Provision of
vegetable seeds
& inputs |
Burac West |
0.070 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
1.040 |
|
|
|
BURAC EAST |
|
Abaca
Rehabilitation |
Provision of
planting
materials and
working capital |
Burac East |
0.375 |
CARE |
DA-DAR-DENR |
|
Coconut
Rehabilitation |
Provision of
planting
materials and
working capital |
Burac East |
0.18 |
CARE |
DA-DAR-DENR |
Pili
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
Burac East |
0.625 |
CARE |
DA-DAR-DENR |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
Burac East |
0.025
0.200
0.010 |
CARE |
DAR-LGU-PVO |
|
Vegetable/Cashcrops |
Provision of
vegetable seeds
& inputs |
Burac East |
0.030 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
1.445 |
|
|
|
ARC PROGRESO,
SAN MIGUEL |
|
Abaca
Rehabilitation |
Provision of
planting
materials and
working capital |
Progreso, San
Miguel |
1.125 |
CARE |
DA-DAR-DENR |
|
Coconut
Rehabilitation |
Provision of
planting
materials and
working capital |
Progreso, San
Miguel |
0.800 |
CARE |
DA-DAR-DENR |
|
Vegetable
Production and
Cash Crops |
Provision of
planting
materials and
working capital |
Progreso, San
Miguel |
0.040 |
CARE |
DA-DAR-DENR |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
Progreso, San
Miguel |
0.025
0.200
0.010 |
CARE |
DAR-LGU-PVO |
|
Vegetable/Cashcrops |
Provision of
vegetable seeds
& inputs |
Progreso, San
Miguel |
0.040 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
2.240 |
|
|
|
TURAOK,
BAGAMANOC |
|
Abaca
Rehabilitation |
Provision of
planting
materials and
working capital |
Turaok,
Bagamanoc |
0.600 |
CARE |
DA-DAR-DENR |
|
Coconut
Rehabilitation |
Provision of
planting
materials and
working capital |
Turaok,
Bagamanoc |
0.230 |
CARE |
DA-DAR-DENR |
|
Vegetable Seed
Dispersal and
Cash Crops |
Provision of
planting
materials and
working capital |
Turaok,
Bagamanoc |
0.040 |
CARE |
DAR-DA-LGU |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
Turaok,
Bagamanoc |
0.025
0.200
0.005 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
1.100 |
|
|
|
ARC
RIZAL-SAGRADA,
VIGA |
Abaca
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC
Rizal-Sagrada,
Viga |
0.300 |
CARE |
DA-DAR-DENR |
Coconut
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC
Rizal-Sagrada,
Viga |
0.45 |
CARE |
DA-DAR-DENR |
|
Rice Production |
Provision of
planting
materials and
working capital |
ARC
Rizal-Sagrada,
Viga |
0.300 |
CARE |
DA-PASO-LGU |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
ARC
Rizal-Sagrada,
Viga |
0.025
0.200
0.010 |
CARE |
DAR-DA-LGU |
|
Vegetable/Cashcrops |
Provision of
vegetable seeds
& inputs |
ARC
Rizal-Sagrada,
Viga |
0.030 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
1.315 |
|
|
|
BAGAWANG, PANDAN |
Abaca
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC Bagawang,
Pandan |
0.150 |
CARE |
DA-DAR-DENR |
Coconut
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC Bagawang,
Pandan |
0.400 |
CARE |
DA-DAR-DENR |
|
Rice Production |
Provision of
planting
materials and
working capital |
ARC Bagawang,
Pandan |
0.100 |
CARE |
PASO-LGU-DA |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
ARC Bagawang,
Pandan |
0.025
0.200
0.005 |
CARE |
DAR-DA-LGU |
|
Vegetable/Cashcrops |
Provision of
planting
materials and
other inputs |
ARC Bagawang,
Pandan |
0.050 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
4.210 |
|
|
|
ARC MILAVIGA,
CARAMORAN |
Lasa
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC Milaviga,
Caramoran |
0.200 |
CARE |
DAR-PASO-LGU |
Abaca
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC Milaviga,
Caramoran |
0.300 |
CARE |
PASO-LGU-DA |
Coconut
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC Milaviga,
Caramoran |
0.300 |
CARE |
DA-DAR-DENR |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
ARC Milaviga,
Caramoran |
0.025
0.200
0.005 |
CARE |
DAR-DA-LGU |
|
Vegetable/Cashcrops |
Provision of
planting
materials and
other inputs |
ARC Milaviga,
Caramoran |
0.050 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
1.080 |
|
|
|
ARC CASAMA,
PANGANIBAN |
Abaca
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC CASAMA,
Panganiban |
0.615 |
CARE |
DA-DAR-DENR |
Coconut
Rehabilitation/
Production |
Provision of
planting
materials and
working capital |
ARC CASAMA,
Panganiban |
0.600 |
CARE |
DA-DAR-DENR |
|
Pili Production |
Provision of
planting
materials and
working capital |
ARC CASAMA,
Panganiban |
0.700 |
CARE |
DA-DAR-DENR |
|
Livestock
Production and
Dispersal |
Provision of
female piglets
(10 heads)
Provision of
female carabao
(10 heads)
Provision of
Sasso chicken
(100 heads) |
ARC CASAMA,
Panganiban |
0.025
0.200
0.010 |
CARE |
DAR-DA-LGU |
|
Vegetable/Cashcrops |
Provision of
planting
materials and
other inputs |
ARC CASAMA,
Panganiban |
0.050 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
2.200 |
|
|
|
TOTAL |
|
|
19.8875 |
|
|
|
MASBATE |
|
MASBATE CITY |
|
Rehabilitation
of Farms on Corn
Production |
Livelihood
Project |
Igang ARC / 100 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
Igang ARC / 50 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
Igang ARC / 100 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Igang ARC / 50 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Igang ARC / 50 |
0.088 |
CARE |
DAR |
|
Rehabilitation
of FMR (8.3 kms) |
Livelihood
Project |
Igang ARC / 2000 |
8.500 |
CARE |
DAR |
|
Rehabilitation
of STW (1 unit) |
Irrigation
Project |
Igang ARC / 50 |
0.030 |
CARE |
DAR |
|
Rehabilitation
of Brgy. Hall |
Rehab 2 units
brgy. Hall |
Igang ARC / 3500 |
0.300 |
CARE |
DAR |
|
Rehabilitation
of Spillway |
Rehab of 2 units
Spillway |
Igang ARC / 3000 |
0.600 |
CARE |
DAR |
Rehabilitation
of School
Building
(1 unit) |
Rehab of 1
School Building |
Igang ARC / 100 |
0.100 |
CARE |
DAR |
|
Rehabilitation
of Irrigation
Pump |
Rehab 25 has. |
Igang ARC / 25 |
0.050 |
CARE |
DAR |
|
Rehabilitation
of multi-purpose
center |
Rehab of 4m X 5m |
Igang ARC / 2000 |
0.200 |
CARE |
DAR |
|
Rehabilitation
of Health Center |
Rehab 3 x 5 m
Health Center |
Igang ARC / 2500 |
0.350 |
CARE |
DAR |
|
Rehabilitation
of Day Care
Center |
Rehab 3 x 4 m
Health Center |
Igang ARC / 2500 |
0.300 |
CARE |
DAR |
|
Rehabilitation
of Deepwell |
Rehab of 14
units Deepwell |
Igang ARC / 2000 |
0.180 |
CARE |
DAR |
|
Rehabilitation
of Kneader |
Rehab of 1 unit
Kneader |
Igang ARC / 100 |
0.030 |
CARE |
DAR |
|
Rehab of Level
II Water Supply |
Rehab of Level
II WaterSupply |
Igang ARC / 2000 |
0.300
|
CARE |
DAR |
|
Rehabilitation
of Street Light |
Repair of Street
Light |
Igang ARC |
0.200 |
CARE |
DAR |
|
Sub-Total |
|
|
11.818 |
|
|
|
BALUD |
|
Repair of San
Andres Sea Wall |
Rehab of 100 km
Sea Wall |
Mabuhay ARC/
1500 |
0.600 |
CARE |
DAR |
|
Rehabilitation
of Mabuhay-San
Andres FMR |
Rehab of 6 km
FMR |
Mabuhay ARC /
3000 |
6.014 |
CARE |
DAR |
|
Rehabilitation
of 7m x 10m ARC
Training Center |
Rehab of 7 x 10m
Training Center
|
Mabuhay ARC /
300 |
0.107 |
CARE |
DAR |
|
Renovation of
Brgy. Health
Center |
Rehab of 4 x 5m
Health Center |
Mabuhay ARC /
1700 |
0.051 |
CARE |
DAR |
|
Rehabilitation
of Farms on Corn
Production |
Livelihood
Project |
Mabuhay ARC / 50 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
Mabuhay ARC / 50 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
Mabuhay ARC / 40 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Mabuhay ARC / 55 |
- |
CARE |
DAR |
|
Sub-Total |
|
|
7.274 |
|
|
|
CAWAYAN |
|
Rehabilitation
of Farms on Rice
Production |
Livelihood
Project |
TAMA ARC / 35 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project
|
TAMA ARC / 50 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
TAMA ARC / 30 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
TAMA ARC / 50 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
TAMA ARC / 50 |
0.088 |
CARE |
DAR |
Rehabilitation
of FMR, Junction
Malbug to Sitio
Agoho Diotay
(3 kms) |
Rehab of FMR |
TAMA ARC / 2000 |
1.500 |
CARE |
DAR |
Rehabilitation
of SWIP
Taberna-
Irrigation
Malbug- Irrigation |
Rehab/Improvement
of 50 has Irrig.
Project |
TAMA ARC / 150 |
0.900
0.900 |
CARE |
DAR |
|
Sub-Total |
|
|
0.208 |
|
|
|
DIMASALANG |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
MAMIA ARC / 55 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
MAMIA ARC / 50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
MAMIA ARC / 50 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
MAMIA ARC / 50 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
.494 |
|
|
|
MILAGROS ( ARC
MATAGBAC ) |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
Matagbac ARC /
50 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
Matagbac ARC /
35 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Matagbac ARC /
55 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Matagbac ARC |
0.088 |
CARE |
DAR |
|
Rehabilitation
of FMR |
Imbudo to
Bacolod |
2,000 FBs/TAJAM
ARC |
3.000 |
CARE |
DAR-DA-LGU |
|
Sub-Total |
|
|
3.494 |
|
|
|
MONREAL |
|
Rehabilitation
of Farms of Corn
Production |
Livelihood
Project |
MAMANI ARC/100 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Real-Kapatagan
Spillway Road |
Road Rehab/
Improvement |
MAMANI ARC/ 3000 |
3.514 |
CARE |
DAR |
|
Rehabilitation
of Maglambong
SWIP |
Improvement/
Construction |
MAMANI ARC/100 |
6.000 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
MAMANI ARC/150 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
MAMANI ARC/50 |
0.088 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
MAMANI ARC/50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
MAMANI ARC/100 |
0.208 |
CARE |
DAR |
|
Sub-Total |
|
|
10.192 |
|
|
|
SAN PASCUAL |
|
Renovation of
Daycare Center |
4m x 5m Day Care
Center |
Cueva ARC/150 |
0.510 |
CARE |
DAR |
|
Repair of Core
Shelter |
Repair of 50
units Core
Shelter |
Cueva ARC/50 |
0.452 |
CARE |
DAR |
|
Bayanihan to
Brgy. Cueva FMR |
FMR Rehab - 2km |
Cueva ARC/2000 |
2.000 |
CARE |
DAR |
|
Rehabilitation
of Farms on Corn
Production |
Livelihood
Project |
Cueva ARC/100 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
Cueva ARC/50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Cueva ARC/50 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Cueva ARC/50 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
3.640 |
|
|
|
USON |
|
Rehabilitation
of Farms on Rice
Production |
Livelihood
Project |
San Ramon ARC/
100 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
San Ramon
ARC/100 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops Production |
Livelihood
Project |
San Ramon ARC/50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
San Ramon ARC/
50 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
San Ramon ARC/40 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
0.184 |
|
|
|
CATAINGAN |
|
Rehabilitation
of Farms on Corn
Production |
Livelihood
Project |
Curvada ARC/100 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
Curvada ARC/80 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
Curvada ARC/50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Curvada ARC/60 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Curvada ARC/40 |
0.088 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
Curvada ARC/50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Curvada ARC/60 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Curvada ARC/40 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
.678 |
|
|
|
CLAVERIA |
|
Rehabilitation
of Farms on Corn
Production |
Livelihood
Project |
PIRNO ARC/100 |
0.183 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
PIRNO ARC/80 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
PIRNO ARC/50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
PIRNO ARC/60 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
PIRNO ARC/50 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
.677 |
|
|
|
MANDAON |
|
Rehabilitation
of two (2)
Classroom School
Building |
Improvement 2
Classroom |
Lantangan ARC/
100 |
0.210 |
CARE |
DAR |
|
Rehabilitation
of 7mx10m ARC
Training Center |
Rehab 7m x 10m
Training Center |
Lantangan ARC/
100 |
0.120 |
CARE |
DAR |
|
Rehabilitation
of
Farm-to-Market
Road |
Road Improvement |
Lantangan ARC/
2000 |
1.925 |
CARE |
DAR |
|
Rehabilitation
of Farms on Rice
Production |
Livelihood
Project |
Lantangan ARC/80 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Lantangan ARC/
85 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Lantangan ARC/
75 |
0.088 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production |
Livelihood
Project |
Lantangan ARC/
50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
Lantangan ARC/
100 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Lantangan
SWIP |
Rehab 56 has.
Source area SWIP |
Lantangan ARC/
100 |
6.000 |
CARE |
DAR |
|
Sub-Total |
|
|
8.933 |
|
|
|
MILAGROS
( ARC TAJAM ) |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
TAJAM ARC/55 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production
|
Livelihood
Project |
TAJAM ARC/17 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
TAJAM ARC/50 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
TAJAM ARC/50 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
.494 |
|
|
|
MOBO |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
LA UMA EXIN PI
ARC/100 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production
|
Livelihood
Project |
LA UMA EXIN PI
ARC/50 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
LA UMA EXIN PI
ARC/60 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
LA UMA EXIN PI
ARC/40 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
.494 |
|
|
|
PLACER |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
Daraga-Mahayag
ARC/100 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production
|
Livelihood
Project |
Daraga-Mahayag
ARC/10 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livehood Project |
Daraga-Mahayag
ARC /100 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Daraga-Mahayag
ARC/50 |
0.088 |
CARE |
DAR |
|
Rehabilitation
of Mahayag SWIP |
Rehab/
Improvement of
Mahayag SWIP |
Daraga-Mahayag
ARC / 388 |
3.000 |
CARE |
DAR |
|
Rehabilitation
of FMR |
Rehab of FMR |
Daraga-Mahayag
ARC / 2700 |
4.000 |
CARE |
DAR |
|
Sub-Total |
|
|
7.494 |
|
|
|
SAN JACINTO |
|
Rehabilitation
of Farms on Corn
Production |
Livelihood
Project |
BAGSTAR ARC/ 100 |
0.184 |
CARE |
DAR |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
BAGSTAR ARC/ 100 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production
|
Livelihood
Project |
BAGSTAR ARC/ 10 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
BAGSTAR ARC / 75 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
BAGSTAR ARC/ 40 |
0.088 |
CARE |
DAR |
|
Rehabilitation
of National Road
- Junction Road |
Livelihood
Project |
BAGSTAR ARC /
3000 |
1.500 |
CARE |
DAR |
|
Sub-Total |
|
|
2.176 |
|
|
|
USON ( DEL
CARMEN ) |
|
Rehabilitation
of Farms on
Hybrid Camote
Production |
Livelihood
Project |
Del Carmen ARC /
100 |
0.208 |
CARE |
DAR |
|
Rehabilitation
of Farms on High
Value Crops
Production
|
Livelihood
Project |
Del Carmen ARC /
15 |
0.022 |
CARE |
DAR |
|
Rehabilitation
of Swine Raising
Project |
Livelihood
Project |
Del Carmen ARC /
75 |
0.176 |
CARE |
DAR |
|
Rehabilitation
of Goat Raising
Project |
Livelihood
Project |
Del Carmen ARC /
50 |
0.088 |
CARE |
DAR |
|
Sub-Total |
|
|
.494 |
|
|
|
TOTAL |
|
|
63.010 |
|
|
|
|
|
Coconut
Rehabilitation |
Planting and
Replanting 8,823
hectares with
CLOA |
22 ARCs/
provincewide |
25.000 |
CARE |
DAR-AREDP/
PCA |
|
|
1,037 hectares
under leasehold
Intercropping
Assistance |
22 ARCs/
provincewide |
18.000 |
CARE |
DAR-AREDP/PCA |
|
Rice Production |
Seed and
fertilizer
assistance |
22 ARCs/
provincewide |
15.000 |
CARE |
DAR/
DA-
LGU |
|
Coffee
Production |
Seed and
fertilizer
assistance |
Bolos, Casiguran |
0.600 |
CARE |
DAR |
|
Vegetable/Rootcrops
Production |
Rehabilitation
of Plantation
Rehabilitation
of Demo Farm
Rehabilitation
of Nursery and
Green Village |
ARCs of Castilla |
5.000 |
CARE |
DAR/
DA-
LGU |
|
Agri-Support
Infrastructure |
Post Harvest
Facilities |
CADECO (San
Rafael, Castilla) |
0.500 |
CARE |
DAR/
PO |
|
|
Repair of
Warehouse/Ricemill |
LAPAFARA (Lahong,
Bulan) |
0.300 |
CARE |
DAR/
PO |
|
|
Repair of
Warehouse/Ricemill |
SCDECO (Sta.
Cruz, Casiguran) |
0.300 |
CARE |
DAR/PO |
|
|
Farm-to-Market
Road
Rehabilitation |
Sta. Cruz,
Casiguran |
3.000 |
CARE |
DAR/LGU |
|
|
Farm-to-Market
Road
Rehabilitation
and Canalization |
Mayon, Castilla |
5.000 |
CARE |
DAR/LGU |
|
|
Foot Bridge
(10LM) |
Sta. Cruz,
Casiguran |
5.000 |
CARE |
DAR/LGU |
|
|
Irrigation |
Tigbao,
Casiguran
ARCs of Castilla |
0.200
2.000 |
CARE |
DAR/NIA
|
|
|
Coffee
Processing Area
(Reconstruction
of Building) |
Bolos, Irosin |
0.500 |
CARE |
DAR |
|
|
Dried Fish
Processing Area
(Reconstruction
of Building) |
Nasuje, Bulan |
0.300 |
CARE |
DAR |
|
|
Rehabilitation
Buying Station
of Castilla
Coconut Farmers
Multi-Purpose
Coop |
San Isidro,
Castilla |
0.500 |
CARE |
DAR/Coop |
|
Sub-Total |
|
|
81.200 |
|
|
|
PROJECTS FOR
FUNDING FROM
OTHER SOURCES |
|
Resource
Management
Program |
Rehabilitation
Pearl Farm |
ARC-Castilla |
1.000 |
CARP Fund |
DAR |
|
|
Rehabilitation
of Oyster
Culture |
ARC connectivity
of Sorsogon
Castilla and
Casiguran |
1.500 |
CARP Fund |
DAR |
|
Basic Social
Services |
Repair of Day
Care Centers |
22 ARCs of
Sorsogon (15
units) |
1.500 |
CARP Fund |
DAR |
|
|
Repair Learning
Centers (Adult) |
22 ARCs of
Sorsogon (10
units) |
1.000 |
CARP Fund |
DAR/
DSWD |
|
Sub-Total |
|
|
5.000 |
|
|
|
TOTAL |
|
|
81.200 |
|
|
back to top
|